is seeking certified and qualified DVBE subcontractors and/or suppliers to provide 'This project is to Modernize the (E) Lynwood High School Campus, Six (6) (E) Buildings, which are Administration-F, 1story, 13,052 SQFT, Type V-1 ,Group E, Library-D, 2story, 18,450 SQFT, Type V-1, Group E-1, Performing Arts-A, 1story, 10,138 SQFT, Type II-1,A-2, Industrial Arts-H, 1story, 9,920 SQFT, Type V-N, Group E, Gymnasium-C, 1 story, 24,538 SQFT, Type II-FR, Group A-2, and Food Services-I, 1story, 4,515,SQFT, Type II-1, Group B-2. The Scope of Work includes but not limited to Exterior & Interior Finishes, Roofing & Skylight, Upgrading Restroom, Food Services Equipment, motorized Rigging System, and includes Building Infrastructure, e.g. Mechanical, Plumbing, Electrical & Access Control systems and Site Improvements e.g. Landscaping, Site Lighting and Concrete Pavers. Sub-Contractors shall be licensed pursuant to California law for the trades necessary to perform the Work called for in the Contract Documents. See applicable licenses for subcontractors below: C-1 Insulation and Acoustical C-6 Millwork/cabinetry C-7 Low Voltage C-8 Concrete C-9 Drywall C-10 Electrical C-15 Flooring C-16 Fire Protection C-17 Glazing C-20 HVAC C-21 Demolition C-27 Landscaping and Irrigation C-33 Painting C-35 Lath and Plaster C-36 Plumbing C-38 Refrigerant C-39 Roofing C-42 Sanitation C-43 Sheet metal C-54 Tile C-61 Limited Specialty
LYNWOOD HS IMPERIAL CAMPUS IMPROVEMENT
BID NO. 21MOT26
LYNWOOD UNIFIED SCHOOL DISTRICT
4050 IMPERIAL HWY, LYNWOOD CA 90602, LYNWOOD, CA, 90602
06-16-2026 at 10:00 AM
Gretchen Lim
12133850027
12133850024
520 S. La Fayette Park Place Suite# 503, Los Angeles, CA, 90057
PROJECT DETAILS:
PREVAILING RATES OF WAGES: Prevailing wage requirements apply to public works projects with a value exceeding $1,000.00. The definition of “public works” is found at Labor Code Section 1720, et seq.
This project is subject to the Community Workforce Agreement (CWA) between the City and the Los Angeles/Orange County Building and Construction Trades Council (Trades Council). The CWA establishes labor relations policies and procedures for the Contractor and subcontractors of all tiers – including a local hire goal, payment of employee fringe benefits through a union trust fund, and registering employees through a union hall. A signed Letter of Assent must be submitted with Bid proposal packet. The City of Irvine will utilize a CWA Administrator who will work with the Contractors and the Trades Council to oversee the provisions of the CWA. A copy of the CWA is included in Appendix A. Prior to any work being done on the project, Contractors that are not signatory with one of the unions that are signatory to the CWA shall register each of their own workers (Core Employees) with the appropriate union hall and must provide a listing (Core Employees List, see Appendix A) of their Core Employees to the CWA Admin.
All contractors of all tiers must sign Letter of Assent. Bid proposal shall be in accordance with Lump Sum Bid Price and Unit Prices as specified on Bidder's Proposal and Schedule of Work of the Bid Document. This project is requiring procedure for compliance with LEED Version 4BD+C with certain defined LEED v4.1 to meet a level of SILVER Equivalency.
We are equal opportunity employer and intend to seriously negotiate with qualified DBE/SBE/MBE/WBE/OBE/DVBE subcontractors / suppliers for project participation. We require all Sub-Contractors to furnish 100% Performance & Payment Bonds from a U.S. Treasury listed surety A-6 or better. Premium Cost shall be included in the proposal. By submitting a Bid, Bidders warrants & agrees that they will execute Icon-West’s Sub-Contract without alteration. Further by submitting a Bid to Icon-West, the Bidders agrees to hold
their Bid Proposal for a period of 120 days. A Bid Bond may be required for $ 500K or over Value Contract.
Please click >>www.icon-west.com>> subcontractors >> contract:, in order to review & accept the Terms & Conditions of our Conditions of our Contract Agreement. Call us @ 213-385-0027 for any other Bid information. Sub-Contractor’s shall review the Owner’s General & Special Conditions on this project, as they will be binding.