is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Concrete, Asphalt, Permeable Base, Drainage, Electrical
Villa Park HS Field Renovation
Not Available
Orange Unified School District
18042 Taft Avenue, Villa Park, CA 92861, Villa Park, CA, 92861
07-06-2026 at 05:00 PM
Ethel Montano
619-278-8824
619-278-8761
8884 Jurupa Road, Jurupa Valley, CA, 92509
PROJECT DETAILS:
Villa Park HS Field Renovation
Orange Unified School District
PROJECT DESCRIPTION:
The Villa Park HS Field Renovation includes Athletic field and running track renovation with drainage system.
Item 1 – Deductive Alternate: Two four-inch conduits and the associated concrete pull boxes for future power from pull box “PB-P1” on electrical drawing Sheet E-111 to existing electrical service “MS” on Sheet E-112.
BID DUE DATE & TIME: Monday, July 6, 2026 @ End of Day
Proposals may be emailed to the Estimating Department at estimating@ohnoconstruction.com or faxed to 619-278-8761. Quotes are required at least 2 hours prior to bid time. Proposals received after the Bid Due Date and Time will NOT be considered.
BID DOCUMENTS:
https://ohno.sharefile.com/#/folders/foe1b2fb-bb09-4edd-9c36-e4c30cba1a70
Bid documents are provided for your reference only. All takeoff quantities provided by Ohno Construction are for your convenience only. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote.
*Asphalt subcontractors must agree to meet tolerances as mentioned in the drawings and in the specifications.
STANDARD REQUIREMENTS:
By submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/Addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Ohno is
relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Inconsistent bid terms and conditions shall be void.
Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2%. The surety must be a California admitted surety. Insurance must name Ohno as additionally insured and be in an amount required by the specifications.
BID RESPONSE: