Filanc

is seeking certified and qualified DBE, MBE, SBE and WBE subcontractors and/or suppliers to provide SWPPP, Survey, Materials Testing, Traffic Control, Aggregates, Dewatering, Shoring, Demolition, Well Drilling, Fence, Jack & Bore, Paving, Striping, Landscaping, Precast Concrete, Rebar, Masonry, Structural Steel, Metals, Metal Stud Framing, Wood Terrace & Benching, Roofing, Glazing, Skylights, Doors/OH Doors, Floors, Coatings, Elevator, Laboratory Casework, Window Coverings, Signage, Process Equipment (UV, MF, RO), Pumps, Chemical Storage Tanks, Fire Suppression, Plumbing, Pipe, Valves, Pipe Supports, and HVAC. NAICS Codes: 237110, 236210, 237310, 237990, 238110, 238120, 238140, 238150, 238160, 238190, 238220, 238320, 238330,238350, 238910


PROJECT NAME:

DB Services for the Central Coast Blue AWPF

BID CONTRACT #:

Not Available

AWARDING AGENCY:

City of Pismo Beach

PROJECT LOCATION:

966 Huber Street, Pismo Beach, CA, 93433

BID DUE DATE:

08-13-2026 at 02:00 PM

OUTREACH COORDINATOR:

Julia Masaitis

TELEPHONE:

760-941-7130

FAX:

760-941-3969

ADDRESS:

740 N. Andreasen Drive, Escondido, CA, 92029

PROJECT DETAILS:

SCOPE OF WORK: New AWPF with a nominal product water capacity of approximately 0.50mgd to produce 500AFY. Equalization storage tank with a minimum usable volume of 200,000 gallons, including automated flow control and isolation. Advanced treatment systems include pressurized MF/UF with a minimum of two skids and automated integrity testing, a two-stage RO system and a UV/AOP system. Post-treatment facilities for pH, alkalinity, hardness, and finished water stabilization, followed by final chlorination. Chemical storage and feed systems sized for ultimate buildout. Purified water storage tank and pump station. Approximately 1,000 lf of influent HDPE pipeline conveying secondary effluent from the PBO to the AWPF, and approximately 1,000 lf of HDPE pipeline conveying RO concentrate to the PBO. Pipeline connections to the sanitary sewer system for conveyance of domestic and process waste streams. Ground water recharge infrastructure includes one injection well at the AWPF site and two monitoring wells. BABA Requirements.

Filanc intends to seriously negotiate with qualified SBE/MBE/WBE for project participation, and will assist with obtaining necessary equipment, supplies, materials, bonding, credit lines, and insurance if needed. 

It is the policy of Filanc to encourage equal opportunity in its construction, consultant, material and supply contracts.  Bids/proposals from small businesses, minority-owned, disabled, veteran-owned businesses, women-owned businesses are strongly encouraged. 

Filanc encourages larger contracts to subcontract with smaller DBE’s and encourages contracting with a group of DBE’s when the contract is too large for one firm.

Filanc is committed to equal opportunity and will not discriminate with regard to race, religion, color, ancestry, age, gender, disability, medical condition or place of birth and will not do business with any firm that discriminates on any basis.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.