Ohno Construction Company

is seeking certified and qualified DVBE, SBE, VOSB and Veteran Owned Business Entreprise (VBE) subcontractors and/or suppliers to provide Concrete, Asphalt, Scoreboard, Drywall, Painting, Toilet Accesories, Plastering, Electrical, Low Voltage, Site Demolition, Earthwork, Landscape, Irrigation.


PROJECT NAME:

Bell HS – Field Upgrades with Natural Turf & Track

BID CONTRACT #:

2610092

AWARDING AGENCY:

Los Angeles Unified School District (LAUSD)

PROJECT LOCATION:

4328 Bell Ave., Bell, CA, 90210

BID DUE DATE:

07-30-2026 at 03:00 PM

OUTREACH COORDINATOR:

Ethel Montano

TELEPHONE:

619-278-8824

FAX:

619-278-8761

ADDRESS:

8884 Jurupa Road, Jurupa Valley, CA, 92509

PROJECT DETAILS:

Bell HS – Field Upgrades with Natural Turf & Track 

Los Angeles Unified School District (LAUSD)

PROJECT DESCRIPTION:

 Demolition and removal of the existing decomposed granite track, natural grass football/soccer field, field event facilities, shot-put area improvements and scoreboard.

Construction of a new regulation size natural grass football/soccer field, decomposed granite track (6-lanes) and field event facilities (long jump, triple jump, high jump), irrigation and drainage, fencing and gates, shot-put area improvements and scoreboard.

Accessibility upgrades for path of travel and existing restrooms as described.

Associated landscape, hardscape, and infrastructure upgrades.

  • Architect: DLR Group
  • Project Location: 4328 Bell Ave., Bell CA 90210
  • Engineer’s Estimate: $8,485,000.00
  • This Project is subject to Project Stabilization Agreement (PSA) requirement.
  • RFI Due Date: July 23, 2026 at noon.
  • MEP Subcontractors must be prequalified by LAUSD by July 24, 2026 (C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46)
  • Subcontractors bidding on this project must carry a CSLB license and must be registered with DIR for public works.
  • Minority Business Requirement Apply: DVBE (3%), SBE (25%), VBE (5%). Subs & Suppliers must register to become LAUSD Certified before award.   
  • Acknowledge all Addenda.
  • Owner Controlled Insurance Program (OCIP) participation is required.
  • Project Start: August 2026
  • Project Substantial Completion: February 2028
  • Project Final Completion: April 2028
  • Contract Duration is 605 Calendar Days

BID DUE DATE & TIME:  Thursday, July 30th @ End of Day

Proposals may be emailed to the Estimating Department at estimating@ohnoconstruction.com or faxed to 619-278-8761. Quotes are required at least 2 hours prior to bid time. Proposals received after the Bid Due Date and Time will NOT be considered.

BID DOCUMENTS:

https://ohno.sharefile.com/d-s01d4e6b63d534e14a2296057d4fb3fca

  1. Enter Email:                                  ohnocc.ca@gmail.com
  2. Enter Password:                           Yosh1966*

Bid documents are provided for your reference only. All takeoff quantities provided by Ohno Construction are for your convenience only. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote.

*Asphalt subcontractors must agree to meet tolerances as mentioned in the drawings and in the specifications.

STANDARD REQUIREMENTS:

By submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/Addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Ohno is relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Inconsistent bid terms and conditions shall be void. 

Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2%. The surety must be a California admitted surety. Insurance must name Ohno as additionally insured and be in an amount required by the specifications. 