is seeking certified and qualified DBE, HUD Section 3, MBE, SBE, WBE, Small Business in Rural Area(SBRA) and Labor Surplus Area Firm(LSAF) subcontractors and/or suppliers to provide Pipe and Valve Materials, Rebar, Painting, Misc. Metals Materials, Concrete Ready Mix Materials
Frick Unit Lateral N0 Pipeline Phase 3
Not Available
Arvin-Edison Water Storage District
East Panama Lane & South Edison Road, Kern County, CA, Bakersfield, CA, 93307
08-18-2026 at 10:00 AM
Scott Fults
6613871600
Not Available
P.O. Box 28130, Fresno, CA, 93729
PROJECT DETAILS:
The Work, in general, consists of furnishing all labor, materials and equipment necessary to construct approximately 5.5 miles of irrigation pipelines ranging in size from 24-inch down to 6-inch pipe including bends, air vents, isolation valves, open cut road encased crossings, and multiple grower turnouts with flowmeters.
WML actively invites and encourages all certified DBE Firms during our bidding processes. We are an equal opportunity employer. The plans and specs are available for your review at our office. We accept bids on any and all portions of work. We will receive pricing for a breakdown of items. For example, a painting scope could be broken out into above-grade piping, below-grade piping, building coatings, equipment coatings, CMU wall protective coating, chemical floor coating, etc. We can make efforts to establish delivery schedules, where requirement permits, to encourage your participation. We actively invite and encourage all certified SBE Firms during our bidding processes. If the project has a specified GFE, WML also requires subcontractors to follow the same required steps. We encourage DBE companies to contract with a consortium of DBEs when a contract is too large for your firm to handle individually. We will work with certified DBE’s that group together if the scope of work is too large for one firm. W. M. Lyles Co. and all subcontractor/suppliers shall abide by the requirements of 41 CFR §§ 60-1.4(a), 60-300.5(a) and 60-741.5(a). These regulations prohibit discrimination against qualified individuals based on their status as protected veterans or individuals with disabilities and prohibit discrimination against all individuals based on their race, color, religion, sex, sexual orientation, gender identity, national origin, or for inquiring about, discussing, or disclosing information about compensation. Moreover, these regulations require that covered prime contractors and subcontractors take affirmative action to employ and advance in employment individuals without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, protected veteran status or disability. By submitting a proposal, you agree to comply with all the provisions set forth in 29 CFR Part 471, Appendix A to Subpart A (Executive Order 13496).
Project Clarifications:
The plans and specifications available for review are “As Advertised” and “For Information Only”. We highly encourage all subcontractors and suppliers to request and procure with the owner their own project documents in order to receive any and all updates via addendum.
Contractor License Number, DIR Registration Number and DBE Certification must be included with any bid submission.
Please note that all California public works projects are prevailing wage projects and that WML is signatory to the Carpenters, Cement Masons, Laborers, and Operator Engineers Unions.
Please note that you may be required to furnish a 100% Payment & Performance Bond from an approved surety based on the amount of the bid. The Bond costs, based on your provided bid day rate, will be paid by W. M. Lyles Co. Please include your bond rate with your proposal.
This project DOES require American Iron and Steel (AIS).
This project DOES require BABA “Build America, Buy America”
Thank you in advance for your assistance with this project.