is seeking certified and qualified HUD Section 3, SBA 8(a), SBE, SDVOSB, VOSB and WOSB subcontractors and/or suppliers to provide Subcontractors- Liner, Electrical, Biologist, Survey, SWPPP, UXO Monitoring Suppliers- Concrete Anchor Blocks, Waterworks
P1311U Correct Water Treatment Plant Reverse Osmosis Brine Pond Capacity
N6247326RF013
NAVFAC Southwest
Marine Corps Air Ground Combat Center, Twentynine Palms, CA
09-01-2026 at 02:00 PM
Brenda Martinez
909-622-2259
Not Available
1383 South Signal Dr., Pomona, CA, 91766
PROJECT DETAILS:
Estimated Project Value: $7.7M
Project Scope:
This project will support the design and construction for an approximately five (5) acre brine evaporation pond with double containment liner and leak detection system that complies with the regulatory requirements of the California State Water Resources Control Board and Navy/United States Marine Corps (USMC) codes/criteria. The work includes ground water monitoring wells, design and permitting prior to excavation; earthwork for pond embankments and stormwater diversion channel; installation of a non-porous liner with leak detection systems; gravel surfaced access roads, utility connections (brine process water, electrical power, and fiber optic) and all incidental related work.
Assistance will be available in obtaining bonds, lines of credit, insurance, necessary equipment, supplies, materials or related technical assistance.
Reyes Construction, Inc. is signatory to the following unions: Teamsters, Operators, Cement Masons, Carpenters and Laborers.
For information on the availability of scope of work, plans, and specifications, please contact our office.
Plans, Specifications, and Contract requirements can be viewed at no additional cost:
Please e-mail Questions and Quotes to: Estimating@reyesconstruction.com