W. M. Lyles Co.

is seeking certified and qualified DBE, MBE and WBE subcontractors and/or suppliers to provide Aggregate Materials, Paving, Pipe and Valve Materials, Landscaping, Electrical, HDPE Geomembrane Materials, Rebar, Concrete Materials, Precast Concrete, Masonry, Structural Steel, Misc. Metals, Roofing, Painting, Doors Frames and Hardware, Overhead Coiling Doors, Windows and Glazing, Pumps, Chemical Equipment, Metal Building, Tanks, Portable Davit and Gantry Cranes, Fabricated Pipe, HVAC, Interior Framing and Drywall, Tile Installer, Specialty Flooring and Trim, Acoustical Ceiling, Bird Control Devices, Metal Decking, Fencing, Drilled Piers, Site Concrete, Site Grading, Operable Partition, Wood Cabinetry, Sheet Metal, and Trucking


PROJECT NAME:

Purified Water Replenishment San Jacinto Valley Advances Water Purification Facility

BID CONTRACT #:

25-000427

AWARDING AGENCY:

Eastern Municipal Water District

PROJECT LOCATION:

770 N Sanderson Ave, San Jacinto, CA, 92582

BID DUE DATE:

10-20-2026 at 10:00 AM

OUTREACH COORDINATOR:

Scott Fults

TELEPHONE:

6613871600

FAX:

Not Available

ADDRESS:

P.O. Box 28130, Fresno, CA, 93729

PROJECT DETAILS:

The Work, in general, consists of: 

1. Site mass grading for the preparation of the AWPF and brine bonds construction; 

2. AWPF building, including: 

3. Chemical storage facilities, 

4. AWPF process area, including mechanical room, electrical room, and maintenance shop,  

5. Administrative rooms including restrooms, locker rooms, breakroom, control room, server room, conference room, and associated features to facilitate public tours,  

6. Outbuilding canopy structures, 

7. Major process equipment including UF/RO systems, tanks, pumps, chemical metering pumps, strainers, cartridge filters; 

8. Building HVAC, plumbing, drainage systems; 

9. System influent pumpstation, waste neutralization system, sewage lift station, product water pump station; 

10. Product water pipeline installation to existing pipeline tie-in points on SJVRWRF property; 

11. Wastewater discharge line installation to tie-in points within the SJVRWRF; 

12. Potable water line installation from SJVRWRF to AWPF; 

13. Brine line installation from AWPF to brine pond; 

14. Instrumentation duct banks, wiring, field devices, PLCs, HMIs, SCADA, UPS systems, etc.; 

15. Electrical substation to be owned and operated by SCE. See Appendix G for SCE Plans. The summary of work for the substation will be broken down as follows: 
          1. Summary of work by SCE: 
               a. Overhead 
                   1) Poles and conductors  

               b. Underground 
                   1) Pulling of new conductors 

               c. Substation 
                   1) Procurement and installing all above ground enclosures

                   2) Landing and testing all new conductors

           2. Summary of work by Contractor: 
              a. Overhead 
                   1) Fine grading and access road cover 

              b. Underground 
                   1) New duct banks and pull boxes as shown 

              c. Substation 
                   1) All civil work including grading, fencing, and cover 
                   2) Concrete pads on the grade for new work 
                   3) SPCC containment curb 

16. System integration; 

17. Building safety and security systems; 

18. Site storm drains collection systems; 

19. Site paving, landscaping, fencing, etc; 

20.  Startup and Commissioning; 

21. Warranties.  

22. All work on this project shall be performed in accordance with these plans and specifications and the latest edition of the Eastern Municipal Water District’s Standard Detailed Provisions and Engineering Standards, Specifications and Drawings. 

 

WML actively invites and encourages all certified DBE Firms during our bidding processes. We are an equal opportunity employer. The plans and specs are available for your review at our office. We accept bids on any and all portions of work. We will receive pricing for a breakdown of items. For example, a painting scope could be broken out into above-grade piping, below-grade piping, building coatings, equipment coatings, CMU wall protective coating, chemical floor coating, etc. We can make efforts to establish delivery schedules, where requirement permits, to encourage your participation. We actively invite and encourage all certified SBE Firms during our bidding processes.  If the project has a specified GFE, WML also requires subcontractors to follow the same required steps. We encourage DBE companies to contract with a consortium of DBEs when a contract is too large for your firm to handle individually. We will work with certified DBE’s that group together if the scope of work is too large for one firm. W. M. Lyles Co. and all subcontractor/suppliers shall abide by the requirements of 41 CFR §§ 60-1.4(a), 60-300.5(a) and 60-741.5(a). These regulations prohibit discrimination against qualified individuals based on their status as protected veterans or individuals with disabilities and prohibit discrimination against all individuals based on their race, color, religion, sex, sexual orientation, gender identity, national origin, or for inquiring about, discussing, or disclosing information about compensation. Moreover, these regulations require that covered prime contractors and subcontractors take affirmative action to employ and advance in employment individuals without regard to race, color, religion, sex, sexual orientation, gender identity, national origin, protected veteran status or disability.  By submitting a proposal, you agree to comply with all the provisions set forth in 29 CFR Part 471, Appendix A to Subpart A (Executive Order 13496).

Project Clarifications:
The plans and specifications available for review are “As Advertised” and “For Information Only”. We highly encourage all subcontractors and suppliers to request and procure with the owner their own project documents in order to receive any and all updates via addendum. 

Contractor License Number, DIR Registration Number and DBE Certification must be included with any bid submission. 
Please note that all California public works projects are prevailing wage projects and that WML is signatory to the Carpenters, Cement Masons, Laborers, and Operator Engineers Unions.


Please note that you may be required to furnish a 100% Payment & Performance Bond from an approved surety based on the amount of the bid. The Bond costs, based on your provided bid day rate, will be paid by W. M. Lyles Co. Please include your bond rate with your proposal. 

This project DOES require AIS “American Iron & Steel” for Schedule A (PWR SJVAWPF)

This project DOES require BABA “Build America, Buy America”. for Schedule B (PWR Brine Ponds)


Thank you in advance for your assistance with this project.