is seeking certified and qualified DBE, MBE, SBA 8(a), SBE, VOSB and WBE subcontractors and/or suppliers to provide SWPPP, DUST CONTROL, SCHEDULING, SURVEY, DEMOLITION AND DISPOSAL, TRUCKING, TEMPORARY FACILITIES, POTHOLING, CLEARING AND GRUBBING, TRENCHING, SHORING, EARTHWORK, GRADING, WATERWORKS EQUIPMENT AND MATERIALS, CONCRETE CORING, MISCELLANEOUS METALS, FABRICATION, SLIDE GATES, GENERAL CONCRETE AND FORMWORK, REINFORCING STEEL, PRECAST CONCRETE STRUCTURES, AGGREGATE MATERIALS, WELDING
CARATAN RECHARGE PIPELINE
SSJMUD 26-02
Southern San Joaquin Municipal Utility District
Woollomes Ave & Zachary Ave, Delano, CA, 93215
09-16-2026 at 02:00 PM
Alex Silicz
661-619-7417
Not Available
251 Carsen Way, Shafter, CA, 93263
PROJECT DETAILS:
We are an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specifications available by email request to alex@ncidigs.com or andrew@ncidigs.com, or available to view in our office upon request.
The majority of work consists, in general, of installing a new pipeline from the existing Moss Screen Diversion Structure to existing groundwater spreading basins.
We will assist with Bonds, Lines of Credit, and Insurance, if needed.
Subcontractors will be required to enter into our standard contract. No modifications to the contract are permitted. All subcontractors/vendors awarded work on this project must be able to furnish subcontract performance and payment bonds, for the amount of the subcontract bid, issued by an admitted corporate surety acceptable to our company (if required).