is seeking certified and qualified DVBE subcontractors and/or suppliers to provide BIDS FOR THE NOTICE: Notice is hereby given that Erickson-Hall Construction Co., on behalf of the San Diego Unified School District (“District”), is requesting bids from qualified subcontractors (licensed contractors holding a valid A (General Engineering), B (General Building), or appropriate C (Specialty) classification license relevant to the Lease-Leaseback (“LLB”)* Project described below: SUNSET VIEW ELEMENTARY SCHOOL WHOLE SITE MODERNIZATION – (GMP NO. 1) LB25-0935-39-A1-G1 Estimate: $27,379,673 Construction Schedule: 33 months Scope of Work: The sunset view elementary school new construction & modernization project consists of (2) new buildings, Building 400 (administration building) and Building 500 (classroom building) as well as all work required for the certification of (4) existing relocatable classroom buildings, and improvements to the site. The site improvements include but are not limited to, new layout for parking lot, selected upgrades to existing lower level playground, selected upgrades to landscaping and irrigation systems, storm water retention and accessible upgrades as required; other improvements include installation of new photovoltaic system and battery energy storage system (BESS); installation of new pc approved aluminum TMP ramps for existing relocatable classroom Buildings 600, 601, 602 & 603.
Sunset View ES WWM
GMP - No. 1
Erickson-Hall Construction Co.
4365 Hill Street, San Diego, CA, 92107
10-22-2026 at 02:00 PM
Summer Lumpkin
760-796-7700
Not Available
500 Corporate Drive, Escondido, CA, 92029
PROJECT DETAILS:
BID SCHEDULE: All subcontractors must adhere to the Bid Schedule below. If the General Contractor modifies this Bid Schedule, they will issue an addendum.
| EVENT | DEADLINE |
| Non-Mandatory Site Walk | October 1, 2026,at 2:00 PM |
| RFIs Due | October 8, 2026,at 2:00 PM |
| District Prequalification Applications Due | October 8, 2026,at 2:00 PM |
| Bids Due | October 22, 2026,at 2:00 PM |
| Project Contact Name& Title: | Nick Verdis, Senior Estimator |
| Project Contact Email: | (760) 796-7700 and nverdis@ericksonhall.com |
NON-MANDATORY JOB WALK: Attendees shall meet in front of the main office of Sunset View ES, 4365 Hill Street, San Deigo, CA 92107. Failure to attend or extreme tardiness and to sign in may render a bid ineligible.
BIDDING DOCUMENTS: The DSA approved plans and specifications, appendices, and forms will be posted and maintained through BuildingConnected free of charge. For access to the documents, please contact Erickson-Hall Construction Co. and include: Company name, address, phone number, CA License # & classification(s), main point of contact, and bid package number(s) interested in bidding.
BID SUBMISSION: Each bid shall be in accordance with all terms, conditions, plans, specifications, and any other documents that comprise the bid documents. Subcontractors interested in submitting a Bid must submit via BuildingConnected.
BID REQUIREMENTS: Reference the Bidding Documents for information on requirements, such as prequalification; SB 854 / California Department of Industrial Relations (DIR); Project Stabilization Agreement (PSA); Skilled & Trained Workforce; Disabled Veteran Business (DVB) requirements and Emerging Business Enterprises (EBE) goals; bonds and insurance.
PROPRIETARY SPECIFICATIONS: Under Public Contract Code §3400(c)(2), the District or its designee, has made a finding that the following particular materials, products, things. or services are designated by specific brand or trade name in order to match other products in use on the Project:
| 08 71 00 Door Hardware | 11 68 16 Play Structures | 28 13 00 Access Control |
| 28 46 21.11 Addressable Fire-Alarm Systems | 32 18 13 Synthetic GrassSurfacing | 32 84 00 Planting Irrigation |
RFIs: Submit RFI’s via email nverdis@ericksonhall.com to Erickson-Hall Construction Co.
PREVAILING WAGES: Prevailing wage requirements apply to all public works projects and must be followed per Exhibit G,Article 17 of the GeneralConditions of the Master Facilities Lease. The applicable prevailing wage determination during preconstruction is the one in effect on the date the RFP is first published in a newspaper of general circulation. Here, the applicable prevailing wage determination for preconstruction services referenced in the published RFP advertisement is 2026-2. The prevailing wage determination established for the Project shall remain applicable for the full duration of the Project, including all Work performed pursuant to authorized Change Orders under the Agreement, and shall remain in effect until all contract Work has been substantially completed. The applicable prevailing wage determination for an agreement or amendment that adds preconstruction services with public works as defined by Labor Code 1720(a)(1) such as site investigation or an agreement or amendment that adds a Guaranteed Maximum Price (GMP) for construction services, is based on the date the Prime Contractor first published an advertisement for that District defined GMP phase to subcontractors. The first bid advertisement date for each District defined GMP phase shall establish the applicable prevailing wage determination, regardless of how many times the Prime Contractor published an advertisement. That first bid advertisement to subcontractors shall state the applicable prevailing wage determination for construction services for the duration of that Districtdefined GMP phase, including all Change Order Work. Based on its separate publication of the first bid advertisement date, each District defined GMP phase for construction services may have a different prevailing wage determination. The prevailing wage determination established for each District defined GMP phase shall remain applicable for the full duration of the District defined GMP phase, including all Work performed pursuant to authorized Change Orders under the Agreement, and shall remain in effect until all contract Work has been substantially completed. The following is a link to the Department of Industrial Relations (DIR) website to obtain rate information, and any applicable predetermined increases www.dir.ca.gov/oprl/dprewagedetermination.htm.
DISTRICT PREQUALIFICATION: Prequalifications are due per the Bid Schedule. Effective March 1, 2024, any solicitation opening after March 1, 2024, will no longer require Non-MEP prequalification. MEP (Mechanical/Electrical/Plumbing):Subcontractors performing work under one or more of the following licenseclassifications: A or B, and/or performing work of C-4, C-7, C-10, C-16,C-20, C-34, C-36,C-38, C-42, C-43, and C-46 should submit their prequalification application on PlanetBids. Go to tinyurl.com/SDUSD-PlanetBids, login as a vendor, then click the menu on the left, and select prequalification to get started. MEP prequalifications must be renewed annually on the approval anniversary. Bids will not be accepted from non-prequalified MEP subcontractors. Visit sandiegounified.org/contractor-prequalification or email prequal@sandi.net for more information.
PAYMENTAND PERFORMANCE BONDS:All subcontractors submitting bids in excessof $100,000 must be preparedto supply Erickson-Hall Construction with a performance and payment bond issued by a corporate security. Erickson-Hall Construction, at its sole discretion, reserves the right to waive this requirement or permit substitute security or alternate guarantees.
BID PACKAGES: This project is being bid as “Bid Packages” per contract number. If a bidder is interested in bidding multiple bid packages, the bidder must submit individual bids for each bid package per GMP. Bidders may demonstrate economy of scale savings on their proposal forms by bidding multiple bid packages for a single GMP. However, bidders may NOT combine multiple bid packages for multiple GMPs, into a single GMP submission. All bids will be reviewed and evaluated for completeness of scope coverage. Subcontracts shall be awarded, if awarded at all, by the generalcontractor on the basis of lowestbid. The Districtdefines lowest bid as the lowest responsive, responsible bid for a single bid package or the summation of the lowestvalue of multiplebid packages, if multiple bid packages were proposed by a subcontractor. If DVBE mandatory participation is needed, the next lowest subcontractor who can meet the minimum 3% DVBE requirement may be selected.
CSLB: It is required that bidders possess the appropriate classification(s) of California State Contractors License(s) (“CSLB”) for their applicable work. The license must be valid and in good standing, at the time of bid opening and contract award. The District reserves the right to reject any and all proposals and to waive any irregularities or informalities in any proposals or in the bidding process. No Subcontractor may withdraw their proposal for a period of 90 days after the District receives proposals.
*Authorized under Education Code section §17406, LLB is a common delivery method used by approximately 89 school districts in California, including 15 school districts within San Diego County. Effective January 1, 2017, LLB is to be used via a competitive selection process for best value award (in contrast to the regular design-bid-build which requires award to the lowest bidder).