is seeking certified and qualified DVBE subcontractors and/or suppliers to provide The scope of the Cuyamaca College Auto Lifts Replacement Project includes the demolition and removal of all existing automotive lifts and the installation of twelve new lifts, consisting of two flush-mounted alignment lifts, one in-ground two-post lift, and nine two-post automotive lifts. The project also includes Americans with Disabilities Act (ADA) upgrades to the parking lot and restrooms within Building K. To support the new automotive equipment and electric vehicle charging stations, a new transformer and electrical panels will be installed in Building K. A new roof structure will be constructed over the car wash bay, and the existing storage area will be enclosed with two-man doors and five roll-up doors. In addition, Building K will receive a complete exterior paint finish.
Cuyamaca College Auto Lifts Replacement
B26.014
Grossmont-Cuyamaca Community College District
8800 Grossmont College Drive, El Cajon, CA, 92020
10-08-2026 at 02:00 PM
Anna Velazquez
9512005758
9512005752
42020 Winchester Rd., Temecula, CA, 92590
PROJECT DETAILS:
If interested, send an email to estimating@wakecoinc.com.