is seeking certified and qualified ACDBE, DBE, DVBE, LGBTBE, MBE, SBE and WBE subcontractors and/or suppliers to provide AC Paving • Acoustical Ceiling • Acoustical Wall Panels • Aggregates • Architectural Woodwork • Auger Cast Piles • Bird Deterrent Devices • Bollards • Building Furnishings • Building Insulation • Building Interior Specialties • Building Safety & Fire Protection • Cast-In-Place Concrete • Cathodic Protection • Cellular Concrete • Ceramic Tile • Concrete Formwork • Concrete Pumping • Concrete Supply • Cranes & Hoists • Dewatering • Doors • Earthwork • Electrical • Epoxy Injection System • Erosion Control • Expansion Joint Covers • Fiberglass Reinforced Plastic • Fire Suppression • Flashing & Sheet Metal • Flooring • Framing & Gypsum Board • General Surveying • Hatches • HVAC • Installation of Truck Scale • Joint Sealants • Masonry • Mechanical Equipment • Metal Roofing • Minor Concrete • Misc Metals & Structural Steel • Overhead Coiling Doors • Painting & Coating • Pipe & Valve Supply • Pipe Insulation • Plumbing • Potholing • Pre-Fabricated Metal Building & Canopy • Precast Concrete • Precast Utility Structures • Pressure Injected Grout • Quality Control • Rebar • Sawcutting / Core Drill • Shoring • Signage • Skylights • Steel Decking • Striping • Subsurface Utility Exploration/Engineering • Sweeper Truck • Tanks (FRP) • Tanks (Vertical Post-Tensioned) • TPO Roofing • Traffic Control • Trucking • Utility Pole Installation • Water Truck • Waterproofing/Dampproofing • Wells • Windows & Glazing • Wood Lagging
SCWP - SECONDARY TREATMENT AND DEWATERING PROJECT
UY-21-07
City of Sunnyvale
1444 Borregas Ave, Sunnyvale, CA, 94089
08-24-2022 at 03:00 PM
Amanda Schroeder
7074397300
7074397301
4650 Business Center Drive, Fairfield , CA, 94534
PROJECT DETAILS:
The Work includes furnishing of all labor, materials, tax, equipment, incidentals and services for the construction and completion of the “Secondary Treatment and Dewatering Project, Project No.UY-21-07". The Work includes but is not limited to: site work, new building construction, installation of major process equipment, yard piping within the Water Pollution Control Plant boundaries, existing facility modification/demolition, electrical/instrumentation/control system improvements, and related systems and facilities.
This project will be funded by the State Water Resources Control Board’s Clean Water State Revolving Fund (SRF) program and is subject to the requirements of the SRF program. In addition Bidder must comply with requirement of WATER INFRASTRUCTURE FINANCE AND INNOVATION ACT CONDITIONS .Therefore the contractors and all subcontractors shall comply with the conditions and requirements of the above acts.