is seeking certified and qualified HUD Section 3, MBE, SBE and WBE subcontractors and/or suppliers to provide minor concrete, sidewalk, curb and gutter, truncated domes, monolithic sidewalk, handicap ramps, drive approach, cross gutter
HUD-FUNDED CURB, GUTTER, AND SIDEWALK SAN DIMAS AREA
26-27-18
CITY OF BAKERSFIELD
VARIOUS LOCATIONS IN SAN DIMAS AREA, Bakersfield, CA, 93301
11-19-2026 at 11:00 AM
Jason Plank
661-399-3759
Not Available
31207 Denbeste Ct , Shafter, CA, 93263
PROJECT DETAILS:
31207 DENBESTE CT
SHAFTER, CA 93263
OFFICE: (661) 399-3759
Cen-Cal Construction is actively soliciting bids from prospective subcontractors or material suppliers whose businesses are California State Certified MBE, WBE, SBE and Section 3 Contractors or Suppliers.
Bids from prospective subcontractors or material suppliers are sought in connection with the Project Named:
HUD-FUNDED CURB, GUTTER, AND SIDEWALK SAN DIMAS AREA
To be located in the City of Bakersfield and funded in whole or part by Federal Funds.
Bid Date: November 19, 2026 @ 11:00 AM
Interested MBE, WBE, SBE and Section 3 firms may contact Jason Plank at (661) 399-3759 or by email at cencalconstruction@ymail.com until 5:00 PM on November 18, 2026.
* 11/18/2026- 5PM Due Date for Bids Strictly Enforced to Ensure Time to Finish Bid Paperwork on Day of Bid*
Bid documents can be obtained from:
City of Bakersfield 1600 Truxtun Ave, Bakersfield, CA 93301
Contact: Olimpia Fredrick. Phone: (661) 326-3914 Fax: (661) 582-2100 Email: ofrederick@bakersfieldcity.us
*Prospective bidders are encouraged to view the project site and required to perform their own due diligence prior to submitting a bid. *
We are an equal opportunity employer and will consider all bids submitted. Subcontractors are required to possess current contractors license as well as current Liability, Auto & Workers Compensation Insurance with applicable limits to meet the contract documents for said project. We encourage WBE, MBE, SBE and Section 3 Certified Contractors to contact Cen-Cal Construction to learn what assistance we can provide to you, such as: lines of credit, insurance, bonds, equipment, supplies, materials, discounts, plans and specifications, technical services, and other related services. Subcontractor and Trucking quotes/bids must be valid at minimum for the entire duration of the project stated in the contract documents.
Subcontractor and Supplier bids are required by 5:00 PM November 18, 2026.
Bids for the followings Items are being accepted:
Item 1-Construct Sidewalk
Item 2-Curb Cut (Handicap Ramp)
Item 3-Gutter 6” (Drive Approach/Cross Gutter)
Item 4-6” Curb & Gutter
Item 5-8” Curb & Gutter
Item 6-Furnish & Install Truncated Domes
Item 7-Monolithic Poured Sidewalk With Curb Up To 8”
** Also requesting All Supplier Quotes**
** All Items can be broken down by supplier and install**
PDF ATTACHMENTS: