is seeking certified and qualified UDBE subcontractors and/or suppliers to provide Remove Concrete Pa+B2:B38vement (Planing) (Special); Removal of Portions of Present Structure (Class 1); Clean Inlet; Clean Expansion Joint; Aggregate Bag; Pre-fabricated Concrete Washout Structure (Type 1); Storm Drain Inlet Protection (Type III); Removal and Disposal of Sediment (Labor); Removal and Disposal of Sediment (Equipment); Sweeping (Sediment Removal); Removal of Trash; Wildlife Biologist; Removal of Nests; Concrete Sealer; Bridge Expansion Device (Gland) (0-4 Inches); Sawing and Sealing Bridge Joint; Rumble Strip; Sanitary Facility; Public Information Management (Tier III); Epoxy Pavement Marking; Preformed Plastic Pavement Marking (Type II); Preformed Plastic Pavement Marking (Word-Symbol) (Type I); Preformed Plastic Pavement Marking (Xwalk-Stop Line) (Type I); Flagging; Uniformed Traffic Control; Traffic Control Vehicle; Traffic Control Inspection; Traffic Control Management; Flashing Beacon (Portable); Barricade (Type 3 M-A) (Temporary); Barricade (Type 3 M-B) (Temporary); Construction Traffic Sign (Panel Size A); Construction Traffic Sign (Panel Size B); Construction Traffic Sign (Panel Size C); Portable Message Sign Panel; Advance Warning Flashing or Sequencing Arrow Panel (A Type); Drum Channelizing Device; Mobile Attenuator; Night Work Lighting
Polyester Concrete Overlay; I-25 through TREX Corridor
C20896
Colorado Department of Transportation
I-25 through TREX Corridor, Denver County, CO
06-22-2022 at 05:00 PM
Patrick Lambson
6024371711
6024371821
1310 W. 23rd Street, TEMPE, AZ, 85282
PROJECT DETAILS:
The Truesdell Corporation is an Equal Opportunity Employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages. The Truesdell Corporation is not a union signatory contractor. Contact us should you need assistance with obtaining bonding, insurance, equipment, materials and or supplies. Please contact us should you need assistance in obtaining the plans, specifications and contract requirements for this project. Performance and Payment Bonds may be required for the full amount of the subcontract. Subcontractors will be required to execute the Truesdell Corporation’s Standard Subcontract Agreement.