Icon West

is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide BIOLOGICAL DECONTAMINATION. TRANSPORTATION & DISPOSAL HAZARDOUS MATERIALS. CONCRETE REINFORCING. CAST-IN PLACE CONCRETE. STRUCTURAL STEEL FRAMING. ROUGH CARPENTRY. GYPSUM SHEATHING. MODIFIED BITUMINOUS SHEET WATERPROOFING. SBS MODIFIED BITUMINOUS MEMBRANE ROOFING. FLASHING & SHEET METAL. GYPSUM BOARD ASSEMBLIES. ACOUSTICAL CEILING. PAINTING & COATING. CHAIN LINK PARTITION. DETENTION METAL FABRICATIONS. COMMON WORKS RESULT FOR PLUMBING. COMMON WORKS RESULT FOR HVAC. INSTRUMENTATIONS FOR HVAC. HVAC AIR CLEANING DEVICES. COMMON WORKS RESULT FOR ELECTRICAL. FIRE DETECTION & ALARM. CHAIN LINK FENCE & GATES.


PROJECT NAME:

CIM - Air Cooling Facility A

BID CONTRACT #:

IFB C5610801-D

AWARDING AGENCY:

CIM

PROJECT LOCATION:

14901 Central Avenue, Chino, CA, 91710

BID DUE DATE:

07-26-2022 at 02:00 PM

OUTREACH COORDINATOR:

Grace Hernal

TELEPHONE:

12133850027

FAX:

2133850024

ADDRESS:

520 S. La Fayette Park Place Suite# 503, Los Angeles, CA, 90057

PROJECT DETAILS:

This project is to install a new roof-mounted Heating & Cooling Systems on eight (8) Facility 'A' Housing Units at the California Institution for Men (CIM), California Department  of Correction & Rehabilitation. The Scope of works includes but not limited to demolition of the (E) roof-mounted equipment,  installation of the New  HVAC Units and associated electrical & plumbing works & temporary fencing @ Mariposa Housing Unit includes infrastructure connection.

1. This Project is subject to Prevailing Wages, Section 1770, 1771 & 1774 California Labor Code, et seq.of Statutory Requirements in General Conditions, Non Discrimination, Payroll Record, Apprentices, Work Day and Labor Compliance Monitoring & Enforcement by Department of Industrial Relations (DIR). 2. CDCR is committed to supporting Small / Micro Business (SB/SM) whenever possible and a mandatory Disabled Veteran Business Enterprise ( DVBE) Participation no less than three percent (3%) of the total Bid amount. 3. Any individual person, employed directly or indirectly by the contractor to perform work or provide services will be required to comply with all security procedures on State Prison Property, as described on Section 01 33 53 of the Bid Document. 4. The deadline for questions will be on Friday, July 1st . 2022 @ 5:00 PM in writing to Kathy Reyna via email katherine.reyna@cdcr.ca.gov or to Icon West, Inc via Tess Mayo's email tess@icon-west.com. 5. The request of Material, Equipment or Methods Substitution must be submitted within Thirty Five (35) Days from the date of Notice to Proceed, as described in Section 01 25 00 of the Bid Document. 

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.