is seeking certified and qualified DBE subcontractors and/or suppliers to provide Construction Area Signs, Traffic Control System, Prepare Storm Water Pollution Prevention Plan, Rain Event Action Plan, Storm Water Sampling and Analysis, Storm Water Annual Report, Temporary Check Dam, Temporary Silt Fence, Clearing and Grubbing, Roadway Excavation, Geosynthetic Reinforcement, Bonded Fiber Matrix, Aggregate Base 3/4 Minus Crushed Rock, Aggregate Base 1.5 minus crushed rock, 6 inch plastic pipe, 18 inch plastic pipe heated fused HDPE, 6 inch non perforated plastic pipe, permeable material subdrain, tapered inlet, anchor assembly, 36 inch corrugated steel pipe inlet .079 inch thick, remove culvert, rock slope protection, 18 foot metal pipe gate, delineator class 2
Storm Damage Repair to Panther Gap Road (4D010) PM 0.50
217387
County of Humboldt Department of Public Works
Panther Gap Road, Honeydew, CA, 95545
07-12-2022 at 02:00 PM
Gilberto Aceves
530-335-5501
530-335-5510
24339 State Highway 89 North , Burney, CA, 96013
PROJECT DETAILS:
Hat Creek Construction is an Equal Opportunity Employer. If you are planning to bid this project, we encourage your participation and welcome your bid. All qualified bidders will receive consideration without regard to race, color, religion, sex or national origin. Plans & specs available upon request or on the county website.Hat Creek Construction will assist with Bonds, Lines of Credit and Insurance if needed. Assistance is available in obtaining bonds, lines of credit, insurance or other technical information. Subcontractors will be required to enter into our standard contract. Please contact our office at 530-335-5501 if you have any questions regarding this project.