Angeles Contractor, Inc

is seeking certified and qualified DBE subcontractors and/or suppliers to provide demolition, earthwork, asphalt paving, unit pavers, site concrete, site utilities, fences and gates, landscaping and irrigation, rebar, building concrete, masonry, cast stone masonry, structural steel, miscellaneous metals, metal deck, rough carpentry, cabinet, insulation, roofing, sheet metal, metal panel, doors, overhead doors, windows, plaster, metal studs, drywall, ceramic tile, ceiling, flooring, painting, signage, fire extinguishers, blinds, elevator, toilet partitions and accessories, fire sprinklers, plumbing, hvac, electrical, low voltage, fire alarm, etc. __________________________________________________________


PROJECT NAME:

ESUSD HS Band & CBI Building

BID CONTRACT #:

23-001

AWARDING AGENCY:

El Segundo USD

PROJECT LOCATION:

640 Main St, El Segundo, CA, 90245

BID DUE DATE:

09-01-2022 at 02:00 PM

OUTREACH COORDINATOR:

Amir Markazi

TELEPHONE:

6269233800

FAX:

6269233801

ADDRESS:

783 Phillips Drive, City of Industry, CA, 91748

PROJECT DETAILS:

New construction of a Band and Community Based Instruction building 9,700 SF with associated Site work at
the El Segundo High School campus. Prequalification required.

RFI due: 8/23/22 @ 4pm (Please send me your RFI by 8/23/22 @ 10AM)

Please see attached job walk agenda.

Thank you.

 

ACI is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope per the plans and specifications regardless of any qualifying proposal language. No
substitutions will be accepted. ACI's listing of a subcontractor is not an acceptance of all or any of that subcontractor's conditions, qualifications, exclusions or exceptions included in the
subcontractor's bid. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's
specifications. Each listed subcontractor must execute ACl's standard subcontract agreement if ACI is awarded the project; the standard subcontract is available for review on ACI's website and at
ACI's office. PLEASE TAKE NOTICE that any subcontractor whose bid is relied upon by ACI must provide 100% performance and payment bonds issued by an admitted surety in an amount not
less than its bid amount; the expense of the bonds is to be borne by the subcontractor. The bonds must guarantee prompt and faithful performance of the subcontract and the payment of all claims
for labor and materials furnished or used in and about the work to be done and performed under the subcontract. Conditions, qualifications, exclusions or exceptions to the bond requirements
contained in a subcontractor's bid are not enforceable. Such bonds must be furnished to ACI within five (5) business days of the project being awarded to ACI. ACI at its sole discretion, reserves
the right to waive the requirements of such bonds, but only in a writing signed by ACl At the discretion of ACI, any listed subcontractor that withdraws its bid after ACI submits its bid to the owner
will be responsible for the difference in price for such scope of work charged by the replacement subcontractor.
Note that ACI is a signatory to the Painters unions; subcontractors must adhere to provisions of the applicable Master Labor Agreement(s) applicable to their trade.
We are no longer signatory to the carpenters union.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.