is seeking certified and qualified DBE subcontractors and/or suppliers to provide Lead Plan, Construction Area Signs, Traffic Control-flagging, Temporary and Final Pavement Markings, PCMS, Portable Signal System, Job Site Management, Prepare WPCP, Bat and Bird Exclusion Device, Contractor Supplied Biologist, Hydroacoustic Monitoring, Erosion Control, Class 2 Base, Asphalt, Asphalt Dike, Cold Plane Asphalt, Furnish and Drive Steel Pile, Furnish Precast Units, Joint Seal Assembly, Core and Pressure Grout Dowel, Rebar-epoxy, stainless and plain, Furnish and Place Polyester Concrete, Bridge Removal-partial, Pedistrian Railing, Cable Railing, MBGR and associated, ST-75 Bridge Railing, Lighting System, Relocate Water Line, Relocate Sanitary Sewer Line
Bridge Rail Upgrade and widening
041-434804
Caltrans
Hwy 1 in Fort Bragg, Fort Bragg, CA, 95437
08-31-2022 at 02:00 PM
Glenn Bugler
5105798711
9254167746
4847 Hopyard Road Suite-4-395, Pleasanton, CA, 94588
PROJECT DETAILS:
Bugler Construction has attended the Manditory Pre Bid Conference and will be bidding as a Prime on this Project. All potential bidders must possess a valid California Contractors License, be registered with the DIR and have insurance complying to Bugler and/or project requirements. Bidders must also be capable of bonding 100% of their work. Bugler will pay bond cost up to 2.0%. Bugler will also provide assistrance in obtaining bonding, insurance, equipmemnt and, if requested, line of credit. Plans and specificatrion are avaliabve at out Pleasanton Office and are also avalible at the Caltrans Website, http://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php. Bugler Construction is willing and eager to work with all qualifed subcontractors and suppliers and is an equal opportunity employer.