is seeking certified and qualified DBE, DVBE, MBE, SBE and WBE subcontractors and/or suppliers to provide Div.2: Demolition; Div.3: Concrete, Concrete Reinforcing, Concrete Sealer, Polished Concrete Finishing, Div.4: Masonry Concrete Block; Div.5: Structural Steel, Metal Fabrications, Miscellaneous Metal; Div.6: Rough Carpentry, Architectural Wood Casework; Div.7: Waterproofing, Insulation, Membrane Roofing, Sheet Metal, Fiber Cement Siding, Roof Accessories, Joint Sealants, Firestopping; Div.8: Doors, Frames, Hardware, Overhead Folding Door, Tubular Daylighting Devices, Access Panels, Glazing; Div.9: Gypsum Board, Plaster, Ceramic Tiling, Ceiling, Flooring, Acoustical Wall Panels, Acoustical Ceiling Treatment, Wall Covering, Painting; Div.10: Visual Display Boards, Signage, Metal Lockers, Benches, Toilet Compartments, Toilet Accessories, Firefighting Devices, Metal Lockers, Bird Deterrence Systems; Div.11: Athletic and Playground Equipment; Div.12: Roller Shades, Flat Screen Mounts, Entrance Mats, Site Furnishings; Div.21: Fire Suppression; Div.22: Plumbing; Div.23: HVAC; Div.26: Electrical; Div.27: Communications, Audio- Video; Div.28: Fire Alarm System; Div.31: Earthwork; Div.32: Asphalt Paving, Concrete Paving, Pavement Markings, Fences and Gates, Landscape, Irrigation; Div.33: Utilities, Sanitary Sewerage, Storm Drainage;
Rosedell School New One Story Classroom Building
3536005-100
Saugus Union School District
27853 Urbandale Avenue, Saugus, CA, 91350
03-02-2022 at 02:00 PM
Amir Markazi
Not Available
6269233801
783 Phillips Drive, City of Industry, CA, 91748
PROJECT DETAILS:
ACI is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope per the plans and specifications regardless of any qualifying proposal language. No substitutions will be accepted. ACI's listing of a subcontractor is not an acceptance of all or any of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications. Each listed subcontractor must execute ACI's standard subcontract agreement if ACI is awarded the project; the standard subcontract is available for review on ACI's website and at ACI's office. PLEASE TAKE NOTICE that any subcontractor whose bid is relied upon by ACI must provide 100% performance and payment bonds issued by an admitted surety in an amount not less than its bid amount; the expense of the bonds is to be borne by the subcontractor. The bonds must guarantee prompt and faithful performance of the subcontract and the payment of all claims for labor and materials furnished or used in and about the work to be done and performed under the subcontract. Conditions, qualifications, exclusions or exceptions to the bond requirements contained in a subcontractor's bid are not enforceable. Such bonds must be furnished to ACI within five (5) business days of the project being awarded to ACI. ACI, at its sole discretion, reserves the right to waive the requirements of such bonds, but only in a writing signed by ACI. At the discretion of ACI, any listed subcontractor that withdraws its bid after ACI submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. Note that ACI is a signatory to the Painters union; subcontractors must adhere to provisions of the applicable Master Labor Agreement(s) applicable to their trade. THIS IS A PREVAILING WAGE PROJECT.