is seeking certified and qualified DVBE subcontractors and/or suppliers to provide ERICKSON-HALL HAS BEEN SELECTED AS THE LEASE LEASE-BACK CONTRACTOR FOR THE VAL VERDE USD CENTRAL KITCHEN. The new building is approximately 39,900 sf and will include central kitchen, freezers, administration, open office space, private offices, break room, warehouse, loading dock, storage, generator, trash enclosures and utility rooms. Building construction features steel frame, metal studs, stucco exterior walls, and built-up roof. Trades will include but not limited to finish grading, concrete paving, building concrete, landscaping, masonry and building construction items. The rough grading, curbs & gutters at asphalt, wet utilities and dry utilities (both stubbed within 5’) scopes were performed in the previous Maintenance & Operations Phase. Estimated Project Budget is $23 Million. Job Walk - Non-Mandatory – 9/20/22 @ 8:00AM (Meet at the Job Site Trailer) RFI Deadline – 9/29/22, Submit to Brian Erickson berickson@ericksonhall.com Bid Date: 10/10/2022 @ 2:00pm Lead Estimator: Jim Thiss jthiss@ericksonhall.com All bids are to be submitted to Erickson-Hall Construction Co. bids@ericksonhall.com All Contractors must comply with AB 3018 - Skilled & Trained Workforce requirements Project subject to pre-qualification, MEP subcontractors are contractors pursuant to Section 7058 of the Business and Professions Code holding an A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 license. - Prequal @ https://www.qualitybidders.com/. Prequalification due by 9/26/22.
Val Verde Central Kitchen
2021-008
Erickson-Hall Construction Co.
975 Morgan Street, Perris, CA, 92571
10-10-2022 at 02:00 PM
Laura Cullifer
7607967700
7607967750
500 Corporate Drive, Escondido, CA, 92029
PROJECT DETAILS:
ERICKSON-HALL HAS BEEN SELECTED AS THE LEASE LEASE-BACK CONTRACTOR FOR THE VAL VERDE USD CENTRAL KITCHEN. The new building is approximately 39,900 sf and will include central kitchen, freezers, administration, open office space, private offices, break room, warehouse, loading dock, storage, generator, trash enclosures and utility rooms. Building construction features steel frame, metal studs, stucco exterior walls, and built-up roof. Trades will include but not limited to finish grading, concrete paving, building concrete, landscaping, masonry and building construction items. The rough grading, curbs & gutters at asphalt, wet utilities and dry utilities (both stubbed within 5’) scopes were performed in the previous Maintenance & Operations Phase. Estimated Project Budget is $23 Million.
Job Walk - Non-Mandatory – 9/20/22 @ 8:00AM (Meet at the Job Site Trailer)
RFI Deadline – 9/29/22, Submit to Brian Erickson berickson@ericksonhall.com
Bid Date: 10/10/2022 @ 2:00pm
Lead Estimator: Jim Thiss jthiss@ericksonhall.com
All bids are to be submitted to Erickson-Hall Construction Co. bids@ericksonhall.com
All Contractors must comply with AB 3018 - Skilled & Trained Workforce requirements
Project subject to pre-qualification, MEP subcontractors are contractors pursuant to Section 7058 of the Business and Professions Code holding an A, B, C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 license. - Prequal @ https://www.qualitybidders.com/. Prequalification due by 9/26/22.