is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN - CONSTRUCTION AREA SIGNS - TRAFFIC CONTROL SYSTEM - STATIONARY IMPACT ATTENUATOR VEHICLE - PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY - PORTABLE CHANGEABLE MESSAGE SIGN (EA) - PREPARE WATER POLLUTION CONTROL PROGRAM - TEMPORARY DRAINAGE INLET PROTECTION - STREET SWEEPING - REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE) - CRACK TREATMENT - REPLACE ASPHALT CONCRETE SURFACING - HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED FRICTION COURSE) - TACK COAT - COLD PLANE ASPHALT CONCRETE PAVEMENT - PUBLIC SAFETY PLAN - REMOVE PAVEMENT MARKER - PAVEMENT MARKER (RETROREFLECTIVE) - THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) - 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) - REMOVE CONTRAST STRIPE - 8" TRAFFIC STRIPE TAPE (WARRANTY)(BROKEN 18-12) - 12" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) - 6" TRAFFIC STRIPE TAPE (WARRANTY) (BROKEN 18-12) - 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) - 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 18-12) - 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 17-7) - 8" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 18-12) - MODIFYING RAMP METERING SYSTEMS - MODIFYING TRAFFIC MONITORING STATIONS -
Caltrans 04-2Q2504 High Friction Surface Treatment
04-2Q2504
Caltrans
Route 80, 580, 680, Alameda County, CA, 94536
10-26-2022 at 05:00 PM
Mac King
6024371711
6024371821
1310 W. 23rd Street, TEMPE, AZ, 85282
PROJECT DETAILS:
Truesdell Corporation of California, Inc. is an Equal Opportunity Employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages. Truesdell Corporation of California, Inc. is a union signatory contractor. Contact us should you need assistance with obtaining bonding, insurance, equipment, materials and or supplies. Please contact us should you need assistance in obtaining the plans, specifications, and contract requirements for this project. Performance and Payment Bonds may be required for the full amount of the subcontract. Subcontractors will be required to execute the Truesdell Corporation’s Standard Subcontract Agreement.
PDF ATTACHMENTS: