Truesdell Corporation of California, Inc.

is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN - CONSTRUCTION AREA SIGNS - TRAFFIC CONTROL SYSTEM - STATIONARY IMPACT ATTENUATOR VEHICLE - PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM DAY - PORTABLE CHANGEABLE MESSAGE SIGN (EA) - PREPARE WATER POLLUTION CONTROL PROGRAM - TEMPORARY DRAINAGE INLET PROTECTION - STREET SWEEPING - REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE) - CRACK TREATMENT - REPLACE ASPHALT CONCRETE SURFACING - HOT MIX ASPHALT-OPEN GRADED (OPEN GRADED FRICTION COURSE) - TACK COAT - COLD PLANE ASPHALT CONCRETE PAVEMENT - PUBLIC SAFETY PLAN - REMOVE PAVEMENT MARKER - PAVEMENT MARKER (RETROREFLECTIVE) - THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY) - 6" THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY) - REMOVE CONTRAST STRIPE - 8" TRAFFIC STRIPE TAPE (WARRANTY)(BROKEN 18-12) - 12" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) - 6" TRAFFIC STRIPE TAPE (WARRANTY) (BROKEN 18-12) - 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) - 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 18-12) - 6" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 17-7) - 8" TRAFFIC STRIPE TAPE WITH CONTRAST (WARRANTY) (BROKEN 18-12) - MODIFYING RAMP METERING SYSTEMS - MODIFYING TRAFFIC MONITORING STATIONS -


PROJECT NAME:

Caltrans 04-2Q2504 High Friction Surface Treatment

BID CONTRACT #:

04-2Q2504

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Route 80, 580, 680, Alameda County, CA, 94536

BID DUE DATE:

10-26-2022 at 05:00 PM

OUTREACH COORDINATOR:

Mac King

TELEPHONE:

6024371711

FAX:

6024371821

ADDRESS:

1310 W. 23rd Street, TEMPE, AZ, 85282

PROJECT DETAILS:

Truesdell Corporation of California, Inc. is an Equal Opportunity Employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages.  Truesdell Corporation of California, Inc. is a union signatory contractor.  Contact us should you need assistance with obtaining bonding, insurance, equipment, materials and or supplies.  Please contact us should you need assistance in obtaining the plans, specifications, and contract requirements for this project. Performance and Payment Bonds may be required for the full amount of the subcontract. Subcontractors will be required to execute the Truesdell Corporation’s Standard Subcontract Agreement.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.