Trade Journal

Haen Constructors

is seeking certified and qualified DBE and DVBE subcontractors and/or suppliers to provide 03_11_07 CONCRETE FORMWORK 03_15_00 CONCRETE ACCESSORIES 03_20_00 CONCRETE REINFORCING 03_21_17 ADHESIVE-BONDED REINFORCING BARS AND ALL THREAD RODS IN CONCRETE 03_30_01 CONCRETE WORK 03_35_29 TOOLED CONCRETE FINISHING 03_60_00 GROUTING 03_63_01 EPOXIES 03_63_02 EPOXY RESIN/PORTLAND CEMENT BONDING AGENT 03_64_24 EPOXY INJECTION SYSTEM 05_05_24 MECHANICAL ANCHORING AND FASTENING TO CONCRETE AND MASONRY 05_12_00 STRUCTURAL STEEL 05_50_00 METAL FABRICATIONS 07_72_33 ROOF HATCHES 09_96_01 HIGH-PERFORMANCE COATINGS 09_99_97 PIPELINE COATINGS AND LININGS 13_34_24 PRE-FABRICATED WALK-IN ELECTRICAL ENCLOSURES 22_42_01 PLUMBING SYSTEMS 23_05_93 TESTING, ADJUSTING, AND BALANCING FOR HVAC 23_09_13 INSTRUMENTATION AND CONTROL DEVICES FOR HVAC 23_31_13 METAL DUCTS 23_34_01 FANS 23_83_01 HEATING UNITS DIVISION 26 – ELECTRICAL DIVISION 31 DIVISION 33 – UTILITIESEARTHWORK DIVISION 40 - PROCESS INTEGRATION DIVISION 46 - WATER AND WASTEWATER EQUIPMENT


PROJECT NAME:

Upper Truckee Pump Station Rehabilitation Project

BID CONTRACT #:

Not Available

AWARDING AGENCY:

South Tahoe Public Utility District

PROJECT LOCATION:

1275 Meadow Crest Drive, South Lake Tahoe, CA, 96150

BID DUE DATE:

11-30-2022 at 02:00 PM

OUTREACH COORDINATOR:

Kami Power

TELEPHONE:

530-541-4700

FAX:

Not Available

ADDRESS:

1012 Industrial Ave. Ste.#2, South Lake Tahoe, CA, 96150

PROJECT DETAILS:

All work associated with this contract shall include, but not be limited to

mobilization/demobilization; excavation; sheeting, shoring, and bracing of excavation;

construction of pumps, valves, instrumentation, and piping; erosion and sediment control;

cleaning; debris removal and disposal; verification of existing conditions and measurements;

sewer flow control; furnishing and installing pipe; providing bypass pumping, temporary piping,

temporary electrical and controls equipment; final connections; inspection and testing; permitting;

site restoration; and such other items or details that are required by the Contract Specifications

and Plans to be performed, placed, constructed, or installed.

PDF ATTACHMENTS:

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2024 Compliance News All rights reserved.