is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE WPCP, TEMP HYDRAULIC MULCH, TEMP COVER, TEMP CHECK DAM, TEMP FIBER ROLL, TEMP SILT FENCE, TEMP CONSTRUCTION ENTRANCE, TEMP CONCRETE WASHOUT, WATER QUALITY (SAMPLING, ANALYSIS, MONITORING, REPORTING), TEMP CREEK DIVERSION SYSTEMS, CONTRACTOR-SUPPLIED BIOLOGIST, NATURAL RESOURCE PROTECTION PLAN, TEMP HIGH-VISIBILITY FENCE, CLEAR & GRUB, ROADWAY EXCAVATION, SHOULDER BACKING, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, DUFF, ROLLED EROSION CONTROL PRODUCT, FIBER ROLLS, COMPOST, CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT, ASPHALT BINDER, GEOSYNTHETIC PAVEMENT INTERLAYER, TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, CAST-IN-DRILLED-HOLE CONCRETE PILING, STEEL SHEET PILING, STRUCTURAL CONCRETE (BARRIER SLAB, BRIDGE), CONCRETE SURFACE TEXTURE (RANDOM ROUGH STACKED ROCK), DRILL & BOND DOWEL, FURNISH PRECAST PRESTRESSED CONCRETE SLAB, ERECT PRECAST PRESTRESSED CONCRETE DECK UNIT, BAR REINFORCING STEEL (BRIDGE), CLEAN & PAINT STEEL SHEET PILING, REMOVE REINFORCED CONCRETE BOX CULVERT, ENGINEERED STREAMBED MATERIAL, LARGE WOOD REVETMENT (CASE A-F, PINNED LOG)WOODY DEBRIS CLUSTER, ROOTWAD STUMP, MISCELLANEOUS METAL, DESTROY WELL, PREP & STAIN CONCRETE, DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), OBJECT MARKER, REMOVE MARKER, VEGETATION CONTROL (MINOR CONCRETE) TUBULAR BICYCLE RAILING, TRANSITION RAILING, ALTERNATIVE IN-LINE TERMINAL SYSTEM, ALTERNATIVE CRASH CUSHION SYSTEM, CONCRETE BARRIER, THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), CONDUIT (BRIDGE)
Structural Concrete Bridge, Engineered Streambed Material, Roadway Excavation
01-0E7904
Caltrans
HWY 254 PM 4.2, near Phillipsville, CA, 95559
11-16-2022 at 02:00 PM
Cassie Coppini
(707) 443-6371
(707) 443-0277
200 Dinsmore Drive, Fortuna, CA, 95540
PROJECT DETAILS:
Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.