is seeking certified and qualified DBE subcontractors and/or suppliers to provide Equipment rental, construction area signs, traffic control, temporary and final traffic markings, temporary barrier system, PCMS, temporary radar feedback signs, prepare WPCP and job site management, street sweeping, clear and grub, roadway excavation-type Z-2, wood mulch, certify existing backflow preventors, temporary and final erosion control work, class 2 base, hot mix asphalt, reinforcing steel, concrete, pumping, sigh structures, furnish polyester concrete, place polyester concrete, bridge removal-partial, minor concrete-curb, sidewalk, island, curb ramp, vegetation control, chain link fence, temporary and final pavement markings, MBGR and end treatments, modify signal and lighting systems, trucking of equipment, asphalt, base, concrete rubble.
Construct pavement, joint seal, barrier, chain link fencing and bridge removal
04-2K1704
Caltrans
Hwy 880 from Union City to San Leandro, San Leandro, CA, 94544
11-30-2022 at 02:00 PM
Glenn Bugler
5105798711
9254167746
4847 Hopyard Road Suite-4-395, Pleasanton, CA, 94588
PROJECT DETAILS:
Bugler Construction will be bidding as a Prime on this Project. All potential bidders must possess a valid California Contractors License, be registered with the DIR and have insurance complying to Bugler and/or project requirements. Bidders must also be capable of bonding 100% of their work. Bugler will pay bond cost up to 2.0%. Bugler will also provide assistrance in obtaining bonding, insurance, equipmemnt and, if requested, line of credit. Plans and specificatrion are avaliabve at out Pleasanton Office and are also avalible at the Caltrans Website, http://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php. Bugler Construction is willing and eager to work with all qualifed subcontractors and suppliers and is an equal opportunity employer.