Knife River Construction

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Knife River Construction is requesting quotes from all qualified subcontractors and suppliers including certified DBE firms for the following items of work, including but not limited to: LEAD COMPLIANCE PLAN, TRAFFIC CONTROL SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, STREET SWEEPING, POTHOLE DATA, CLEARING AND GRUBBING, ROADWAY EXCAVATION, SHOULDER BACKING, CLASS 2 AGGREGATE BASE, FULL-DEPTH RECLAMATION-CEMENT, CEMENT (FULL-DEPTH RECLAMATION-CEMENT), ASPHALTIC EMULSION (FULL-DEPTH RECLAMATION-CEMENT), ASPHALTIC EMULSION (PULVERIZED ROAD-BED), MIX DESIGN (FULL-DEPTH RECLAMATION-CEMENT), PULVERIZED ROADBED, HOT MIX ASPHALT (TYPE A), COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE ASPHALT CONCRETE DIKE, ADJUST INLET, MINOR CONCRETE (CURB AND GUTTER), MINOR CONCRETE (SIDEWALK), On-System Roadway Rehabilitation Town of Paradise, MINOR CONCRETE (CURB RAMP), REMOVE CONCRETE, DETECTABLE WARNING SURFACE, ADJUST MONUMENT COVER TO GRADE, ADJUST ACCESS BOX FRAME AND COVER (UTILITY), ADJUST MANHOLE FRAME AND COVER (UTILITY), ADJUST MANHOLE FRAME AND COVER (STORM DRAIN), REMOVE AND REPLACE MONUMENT, LOWER AND RAISE FRAME AND COVER (UTILITY), DELINEATOR (CLASS 1), REMOVE ROADSIDE SIGN, RESET ROADSIDE SIGN, ROADSIDE SIGN - ONE POST, TERMOPLASTIC PAVEMENT MARKING, PAVEMENT MARKERS (RETROREFLECTIVE-RECESSED), all trucking and supply of materials.


PROJECT NAME:

On-System Roadway Rehabilitation Skyway 2023

BID CONTRACT #:

7303.2 CON

AWARDING AGENCY:

Town of Paradise

PROJECT LOCATION:

5555 Skyway, Paradise, CA, 95969

BID DUE DATE:

12-14-2022 at 02:00 PM

OUTREACH COORDINATOR:

Marc Madsen

TELEPHONE:

5308916555

FAX:

5308946220

ADDRESS:

1764 Skyway, Chico, CA, 95928

PROJECT DETAILS:

Knife River Construction is an Equal Opportunity Employer and is signatory to Operating Engineers, Laborers and Teamsters. 100% payment and performance bonds may be required for full amount of subcontractor price. All subcontractors must be licensed and have liability insurance and workers compensation insurance meeting Knife River Construction's requirements. Knife River Construction is willing to assist with obtaining bonding, insurance, equipment and materials and is willing to break down items into economically feasible packages to encourage participation. Plans and Specifications are made available for viewing on the Caltrans website and Knife Rivers office.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.