Mercer-Fraser Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL, TYPE III BARRICADE, WPCP, TEMP CONSTRUCTION ENTRANCE, TEMP CONCRETE WASHOUT, WATER QUAILITY (SAMPLING, ANALYSIS, REPORTING), CONTRACTOR-SUPPLIED BIOLOGIST, FISH PROTECTION, INVASIVE SPECIES CONTROL, BAT & BIRD EXCLUSION DEVICE, HYDROACOUSTIC MONITORING, HIGH-VISIBILITY FENCE, CLEAR & GRUB, ROADWAY EXCAVATION, STRUCTURE EXCAVATION, STRUCTURE BACKFILL, IMPORT BORROW, ROLLED EROSION CONTROL BLANKET, FIBER ROLLS, HYDROSEED, TEMP SHORING, FURNISH SHEET PILING, DRIVE STEEL SHEET PILE, FURNISH 24” CAST-IN-STEEL SHELL CONCRETE PILING, DRIVE 24” CAST-IN-STEEL SHELL CONCRETE PILING, SEAL COURSE CONCRETE, STRUCTURAL CONCRETE, FURNISH PRECAST PRESTRESSED CONCRETE GIRDER, ERECT PREAST PRESTRESSED CONCRETE GIRDER, JOINT SEAL, BAR REINFORCING STEEL, BRIDGE REMOVAL, REINFORCED CONCRETE PIPE, CONCRETE FLARED END SECTION, REMOVE PIPE, ROCK SLOPE PROTECTION, MISC. METAL, FENCING, PAVEMENT MARKER, OBJECT MARKER, SHORT RADIUS GUARDRAIL SYSTEM, TRANSITION RAILING, END ANCHOR SYSTEM, ALTERNATIVE IN0LINE TERMINAL SYSTEM, CONCRETE BARRIER, TRAFFIC STRIPE


PROJECT NAME:

Pine Hill Road over Swain Slough Bridge

BID CONTRACT #:

594020

AWARDING AGENCY:

County of Humboldt

PROJECT LOCATION:

Pine Hill Road, Eureka, CA, 95503

BID DUE DATE:

01-10-2023 at 02:00 PM

OUTREACH COORDINATOR:

Cassie Coppini

TELEPHONE:

(707) 443-6371

FAX:

(707) 443-0277

ADDRESS:

200 Dinsmore Drive, Fortuna, CA, 95540

PROJECT DETAILS:

Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, please call (707) 443-6371 or e-mail info@mercerfraser.com. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, please call (707) 443-6371 or e-mail info@mercerfraser.com. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.