is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN, DEVELOP WATER SUPPLY, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, TEMP PAVEMENT MARKING, TEMP TRAFFIC STRIPE, PLASTIC TRAFFIC DRUMS, TEMP PAVEMENT MARKER, TEMP BARRIER SYSTEM, TEMP VARIABLE SPEED LIMIT SIGN SYSTEM, TEMP PEDESTRIAN ACCESS ROUTE, PORTABLE CHANGEABLE MESSAGE SIGN, TEMP CRASH CUSHION, JOB SITE MANAGEMENT, PREPARE SWPPP, RAIN EVENT ACTION PLAN, STORM WATER (SAMPLING, ANALYSIS, REPORTING), MOVE-IN/MOVE-OUT (TEMP EROSION CONTROL), TEMP HYDRAULIC MULCH, TEMP COVER, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP SILT FENCE, TEMP CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMP CONCRETE WASHOUT, WATER QUALITY (SAMPLING, ANALYSIS, REPORTING), TEMP CREEK DIVERSION SYSTEMS, ASBESTOS COMPLIANCE PLAN, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, NATURAL RESOURCE PROTECTION PLAN, TEMP HIGH-VISIBILITY FENCE, CLEAR & GRUB, REMOVE TREE, CHANNEL EXCAVATION, ROADWAY EXCAVATION, BASIN EXCAVATION, STRUCTURE EXCAVATION, STRUCTURE BACKFILL CONCRETE BACKFILL, SOIL AMENDMENT, RELOCATE IRRIGATION CONTROLLER, RELOCATE REMOTE CONTROL VALVE & VALVE BOX, FERTILIZER, PLANT (GROUP A & B), PLANT ESTABLISHMENT WORK, WOOD MULCH, CHECK & TEST EXISTING IRRIGATION FACILITIES, OPERATE EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, CONTROL & NEUTRAL CONDUCTORS, REMOTE CONTROL VALVE, RISER SPRINKLER ASSEMBLY, GATE VALVE, GATE VALVE, PLASTIC PIPE, SCHEDULE 40 PVC SLEEVE, CORRUGATED HIGH DENSITY POLYETHYLENE PIPE CONDUIT, ROLLED EROSION CONTROL PRODUCT, HYDROMULCH, FIBER ROLLS, HYDROSEED, COMPOST, INCORPORATE MATERIALS, FINISHING ROADWAY, CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT, PLACE HOT MIX ASPHALT DIKE, REMOVE ASPHALT CONCRETE PAVEMENT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, REMOVE BASE & SURFACING, STEEL SOLDIER PILE, 24" DRILLED HOLE, FURNISH STEEL PILING, DRIVE STEEL PILE, CAST-IN-DRILLED-HOLE CONCRETE PILING, CONCRETE SURFACE TEXTURE, STRUCTURAL CONCRETE, CONCRETE SURFACE TEXTURE, DRILL & BOND DOWEL, JOINT SEAL, BAR REINFORCING STEEL, FURNISH SIGN STRUCTURE (VERSATILE TRUSS), INSTALL SIGN STRUCTURE, ALUMINUM WALKWAY GRATING, REMOVE SIGN STRUCTURE, TIMBER LAGGING, SOUND WALL (MASONRY BLOCK), CLEAN & PAINT STEEL SOLDIER PILING, REMOVE SOUND WALL, BRIDGE REMOVAL, TEMP CULVERT, REINFORCED CONCRETE PIPE, REINFORCED CONCRETE PIPE, CORRUGATED STEEL PIPE ARCH, PLASTIC PIPE UNDERDRAIN, NON-PERFORATED STEEL PIPE UNDERDRAIN, CORRUGATED STEEL PIPE DOWNDRAIN, DOWNDRAIN SLIP JOINT, ANCHOR ASSEMBLY, CORRUGATED STEEL PIPE ENERGY DISSIPATOR, CONCRETE FLARED END SECTION, PRECAST CONCRETE PIPE INLET, REMOVE PIPE, REMOVE DOWNDRAIN, REMOVE INLET, REMOVE HEADWALL, REMOVE DRAINAGE JUNCTION STRUCTURE, REMOVE PCC APRON, REMOVE CONCRETE FLARED END SECTION, ADJUST FRAME & GRATE TO GRADE, MODIFY INLET TO MANHOLE, REMOVE CONCRETE, REMOVE SLOPE PAVING, CONCRETE (CHANNEL LINING), SLOPE PAVING (CONCRETE), RESET SLOPE PAVING, SLOPE PAVING, ROCK SLOPE PROTECTION, ROCK SLOPE PROTECTION FABRIC, DETECTABLE WARNING SURFACE, MINOR CONCRETE, REMOVE CONCRETE (CURB, GUTTER, AND SIDEWALK), PRE/POST CONSTRUCTION SURVEYS, MISC IRON & STEEL, MANHOLE FRAME & COVER, PREP & STAIN CONCRETE, CHAIN LINK FENCE, CHAIN LINK GATES, REMOVE FENCE, REMOVE PAVEMENT MARKER, DELINEATOR, PAVEMENT MARKER (RETROREFLECTIVE), MARKER, REMOVE ROADSIDE SIGN, RESET MILEPOST MARKER, RESET & RELOCATE ROADSIDE SIGNS, FURNISH LAMINATED PANEL SIGN, FURNISH SINGLE SHEET ALUMINUM SIGNS, ROADSIDE SIGNS, INSTALL SIGNS, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL, REMOVE VEGETATION CONTROL, CONCRETE BARRIER, CABLE RAILING, TRANSITION RAILING, END ANCHOR ASSEMBLY, ALTERNATIVE IN-LINE TERMINAL SYSTEM, CONCRETE BARRIER, REMOVE GUARDRAIL, REMOVE CRASH CUSHION, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE PAINTED TRAFFIC STRIPE (HIGH PRESSURE WATER BLASTING), REMOVE THERMOPLASTIC PAVEMENT MARKING, REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE TEMP PAVEMENT MARKING, 12" RUMBLE STRIP, MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, CAMERA SYSTEMS, FIBER OPTIC CABLE SYSTEMS, MODIFYING LIGHTING SYSTEMS, MODIFYING SIGNAL AND LIGHTING SYSTEMS, MODIFYING RAMP METERING SYSTEMS, MODIFYING TRAFFIC MONITORING STATIONS, REMOVING RAMP METERING SYSTEMS, REMOVING TRAFFIC MONITORING STATIONS, TACK COAT, PRIME COAT, CITY OF ROCKLIN TYPE F DROP INLET, CULVERT CONNECTION, MARKER


PROJECT NAME:

ROADWAY EXCAVATION, PLACE C12-AB, HMA, STRUCTURAL CONCRETE & RCP

BID CONTRACT #:

03-3F23U4

AWARDING AGENCY:

CALTRANS

PROJECT LOCATION:

ROUTE 80, ROSEVILLE & ROCKLIN, CA, 95678

BID DUE DATE:

01-26-2023 at 02:00 PM

OUTREACH COORDINATOR:

Cassie Coppini

TELEPHONE:

(707) 443-6371

FAX:

(707) 443-0277

ADDRESS:

200 Dinsmore Drive, Fortuna, CA, 95540

PROJECT DETAILS:

Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, please call (707) 443-6371 or e-mail info@mercerfraser.com. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, please call (707) 443-6371 or e-mail info@mercerfraser.com. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.