Mercer-Fraser Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, PORTABLE DELINEATOR, PORTABLE FLASHING BEACONS, TEMP RAILING (TYPE K), TEMP CRASH CUSHION MODULE, ALTERNATIVE TEMP CRASH CUSHION, TEMP TRAFFIC SCREEN, JOB SITE MANAGEMENT, PREPARE SWPPP, STORM WATER ANNUAL REPORT, TEMP HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP SILT FENCE, TEMP CONSTRUCTION ENTRANCE, STREET SWEEPING, TEMP CONCRETE WASHOUT, HEALTH & SAFETY PLAN, REMOVE YELLOW THERMOPLASTIC TRAFFIC STRIPE (HAZARDOUS WASTE), TREATED WOOD WASTE, CLEAR & GRUB, ROADWAY EXCAVATION, IMPORTED BORROW, ROADSIDE CLEARING, ROCK BLANKET, IRON SULFATE, SOIL AMENDMENT, PACKET FERTILIZER, SLOW-RELEASE FERTILIZER, PLANT (GROUP A, H, U), MAINTAIN EXISTING PLANTED AREAS, PLANT ESTABLISHMENT WORK, GRAVEL MULCH, EDGING, CHECK & TEST EXISTING IRRIGATION FACILITIES, OPERATE EXISTING IRRIGATION FACILITIES, REMOVE IRRIGATION FACILITY, CONTROL & NEUTRAL CONDUCTORS, REMOTE CONTROL VALVES, 24-32 STATION IRRIGATION CONTROLLER, POP-UP SPRINKLER ASSEMBLY (GEAR DRIVEN), RISER SPRINKLER ASSEMBLY, DRIP VALVE ASSEMBLY, PLASTIC PIPING, BALL VALVE, CLASS 3 AGGREGATE BASE, LEAN CONCRETE BASE, HOT MIX ASPHALT, MINOR CONCRETE, REMOVE CONCRETE, CHAIN LINK FENCING, CHAIN LINK GATES, REMOVE CHAIN LINK FENCE, REMOVE GATE, REMOVE PAVEMENT MARKER, PAVEMENT MARKER (RETROREFLECTIVE), REMOVE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGN, ROADSIDE SIGNS, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), PAINT TRAFFIC STRIPE, THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE PAINTED TRAFFIC STRIPE, REMOVE THERMOPLASTIC TRAFFIC STRIPE, REMOVE THERMOPLASTIC PAVEMENT MARKING


PROJECT NAME:

CONSTRUCT ROCK BLANKET & REMOVE/INSTALL CHAINLINK FENCE

BID CONTRACT #:

07-338704

AWARDING AGENCY:

CALTRANS

PROJECT LOCATION:

HWY 405/110 SEPARATION TO HWY 405/105 SEPARATION, LOS ANGELES COUNTY, CA, 90003

BID DUE DATE:

01-12-2023 at 02:00 PM

OUTREACH COORDINATOR:

Cassie Coppini

TELEPHONE:

(707) 443-6371

FAX:

(707) 443-0277

ADDRESS:

200 Dinsmore Drive, Fortuna, CA, 95540

PROJECT DETAILS:

Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, please call (707) 443-6371 or e-mail info@mercerfraser.com. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, please call (707) 443-6371 or e-mail info@mercerfraser.com. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.