Trade Journal

C.T. Brayton & Sons, Inc

is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, Earthwork, Paving Storm Drainage, Chain Link Fencing and Gates, Exterior Signs, Painting, Athletic Track and Field Equipment.


PROJECT NAME:

REBID Escalon High School Track Improvements

BID CONTRACT #:

Not Available

AWARDING AGENCY:

Escalon Unified School District

PROJECT LOCATION:

1520 Yosemite Ave, Escalon, CA, 95320

BID DUE DATE:

01-30-2023 at 02:00 PM

OUTREACH COORDINATOR:

Pam Galbreath

TELEPHONE:

209-838-7388

FAX:

209-838-3960

ADDRESS:

1804 Jackson Ave, Escalon, CA, 95320

PROJECT DETAILS:

PROJECT DESCRIPTION: Lease-Leaseback Project. Scope of work shall include but not be limited to the following: 

  • DEMOLISH EXISTING RUNNING TRACK AND TRACK EVENTS INCLUDING SAND PITS AS SHOWN ON DRAWINGS
  • ACCESSIBLE PATH OF TRAVEL TO CAMPUS
  • DEMOLISH TREES AND TURF AREAS AS REQUIRED FOR NEW WORK
  • NEW CONCRETE AND ASPHALT WALKS AND CURBS
  • NEW SYNTHETIC ALL-WEATHER TRACK SYSTEM INCLUDING STRIPING AND ASSOCIATED SITE WORK BY VENDOR
  • NEW JUMP AND THROWING EVENT AREAS
  • NEW CHAIN LINK FENCING AND GATES
  • MODIFICATION TO EXISTING CHAIN LINK FENCE AND GATES FOR ACCESSIBILITY
  • NEW STORM DRAINAGE SYSTEM
  • REPAIR TURF WHERE DISTURBED DURING CONSTRUCTION
  • MODIFY EXISTING IRRIGATION SYSTEM AS REQUIRED DUE TO NEW WORK

ADDITIVE ALTERNATES:

  • REMOVE EXISTING FOOTBALL FIELD TURF, REGRADE, REPLACE IRRIGATION AND PROVIDE NEW SOD
  • REMOVE AND REPLACE EXISTING FOOTBALL GOAL POSTS

Bid Proposal Submission: Bid Proposals will be accepted on Monday, January 30, 2023, by 2:00 PM. Bid Proposals are to be emailed to estimator@ctbrayton.com or faxed to (209) 838-3960. Bid Proposals emailed elsewhere may not be received in time for submission.

This Project is subject to prequalification. Contractor must be prequalified prior to submitting a proposal.

The district uses PQ Bids for their prequalification process, accessible at www.PQBids.com. A proposal submitted by a contractor that is not prequalified by Owner will not be accepted and will not be considered by Owner. Any subcontractors the contractor lists for Work requiring C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 licenses must have current pre-qualified status with the Owner.

Subcontractors are encouraged to complete the prequalification process as soon as possible to expedite evaluation. The prequalification information is located on the Escalon Unified School Districts website. 

Plans and Specs: are available on our Website at www.ctbrayton.com under “Bidding”.

All Bidders must review insurance requirements and include any additional costs in their cost proposals.

Federal Requirements:This project is subject to certain Federal procurement regulations in accordance with Federal law (Appendix II to Part 200 of Title 2 of the Federal Code of Regulations), and the LLB Entity will be subject to the following provisions under the Lease Leaseback instrument:

● Equal Employment Opportunity.

● Davis-Bacon Act.

● Work Hours and Safety Standards Act.

● Clean Air Act.

● Debarment and Suspension.

● Byrd Anti-Lobbying Amendment

PLEASE INCLUDE YOUR DIR REGISTRATION NUMBER AND CONFIRM YOU CAN MEET AB-566 / SB-693 SKILLED AND TRAINED WORKFORCE REQUIREMENTS WHEN SUBMITTING BID.

DIR Registration requirements for all Public Works projects (SB854):

The requirement to only use registered contractors and subcontractors on public works projects applies to all projects awarded on or after April 1, 2015.

a.         All sub-tier subcontractors must be DIR registered contractors at all times during performance of the Work; and

b.         Prospective subcontractors may only solicit sub-bids from and contract with lower-tier subcontractors who are DIR registered contractors.

AB-566 / SB-693 Skilled and Trained Workforce Requirements:

All subcontractors of any tier must comply with the requirements set forth in Education Code section 17407.5, including providing an enforceable commitment that all Subcontractors of any tier will use a “Skilled and Trained Workforce” as defined in Public Contract Code 2601(d). All Subcontractors are to carefully review all requirements set forth in Public Contract Code 2600-2603 before bidding the project.

DVBE Requirements: (The Owner will require the successful contractor to achieve the minimum goal of 3% DVBE (Disabled Veteran Business Enterprises) established in the RFP or to provide acceptable evidence of good faith efforts to do so. The DVBE documents must be sealed and filed in the Business Office of the Owner at the same time the proposal is sealed and filed.

All work performed on this project which falls under the recognized jurisdiction of the Carpenter’s Master Agreement for Northern California shall be performed by Union Carpenters.

This project is Prevailing Wage. Seeking DVBE Subcontractor/Supplier Participation.

Have any questions?

Send us your message and we'll get back to you within one business day at the very latest.

Social Media

Copyright © 2024 Compliance News All rights reserved.