is seeking certified and qualified DBE subcontractors and/or suppliers to provide Removal of Concrete Pavement Remove Concrete Pavement (Planing) (Special) Removal of Expansion Device Clean Inlet Unsuitable Material Structure Backfill (Flow-Fill) Structure Backfill (Flowable Fly Ash) Aggregate Bag Pre-fabricated Concrete Washout Structure (Type 1) Storm Drain Inlet Protection (Type I) (84 Inch) Pre-fabricated Vehicle Tracking Pad Removal and Disposal of Sediment (Labor) Sweeping (Sediment Removal) Modify Inlet Wildlife Biologist Removal of Nests Aggregate Base Course (Class 6) Concrete Pavement (Patching) Bridge Expansion Device (0-4 Inch) Bridge Expansion Cover Plate Concrete Class DR Reinforcing Steel (Epoxy Coated) Detour Pavement Public Information Management (Tier III) Modified Epoxy Pavement Marking Pavement Marking Paint (High Build) Preformed Plastic Pavement Marking (Type I) Preformed Plastic Pavement Marking (Contrast)(Inlaid) Preformed Plastic Pavement Marking (Type II) (Inlaid) Traffic Control Inspection Traffic Control Management Uniformed Traffic Control Coordination Flashing Beacon (Portable) Barricade (Type 3 M-A) (Temporary) Construction Traffic Sign (Panel Size A) Construction Traffic Sign (Panel Size B) Construction Traffic Sign (Panel Size C) Vertical Panel Portable Message Sign Panel Advance Warning Flashing or Sequencing Arrow Panel (C Type) Drum Channelizing Device Drum Channelizing Device (With Light) (Flashing) Traffic Cone Stackable Vertical Panels Mobile Attenuator
CDOT; 125 @ 58th and 62nd
NHPP0253-290
Colorado Department of Transportation
125 @ 58th and 62nd, Adams County, CO
03-02-2023 at 10:00 AM
Patrick Lambson
6024371711
6024371821
1310 W. 23rd Street, TEMPE, AZ, 85282
PROJECT DETAILS:
The Truesdell Corporation is an Equal Opportunity Employer and will work with any interested subcontractor to identify opportunities to break items into economically feasible packages. The Truesdell Corporation is not a union signatory contractor. Contact us should you need assistance with obtaining bonding, insurance, equipment, materials and or supplies. Please contact us should you need assistance in obtaining the plans, specifications and contract requirements for this project. Performance and Payment Bonds may be required for the full amount of the subcontract. Subcontractors will be required to execute the Truesdell Corporation’s Standard Subcontract Agreement.