Ohno Construction Company

is seeking certified and qualified DVBE, MBE and SBE subcontractors and/or suppliers to provide Concrete, Landscaping, Irrigation, and Lake Construction Specialty


PROJECT NAME:

Centennial Lake Circulation Renovation

BID CONTRACT #:

Project No. 18-2681

AWARDING AGENCY:

City of Santa Ana

PROJECT LOCATION:

3000 W Edinger Ave., Santa Ana, CA, 92704

BID DUE DATE:

02-27-2023 at 05:00 PM

OUTREACH COORDINATOR:

Raquel Tomas

TELEPHONE:

619-278-8824

FAX:

619-278-8761

ADDRESS:

8884 Jurupa Road, Jurupa Valley, CA, 92509

PROJECT DETAILS:

Ohno Construction invites your firm to submit a bid for the following project:

Centennial Lake Circulation Renovation

City of Santa Ana

 

PROJECT DESCRIPTION: Install stormwater quality BMP measures, drain lake, capture and relocate wildlife,

clear and grub construction area, temporarily stockpile recyclable materials, excavation, grading, utility installation, utility vault construction, mechanical equipment installation, lake liner construction, lake edge wall construction, lake plumbing installation, lake biofilter construction, lake water quality system features installation, lake fishery features installation, removal & replacement of asphalt concrete pavement and Portland cement concrete, landscaping, irrigation, hardscape, concrete boat ramp, wood boat dock.

Location: 3000 W Edinger Ave, Santa Ana, CA 92704

Engineers Estimate: $3,554,000

Project Schedule: May 2023 to July 2024 (280 Working days)

This Project is subject to prevailing wage, no OCIP required.

DVBE/SBE/MBE/other Minority - subcontractors and vendors are encouraged to participate

Submit pricing per Bid Form (item/s and quantity) attached; refer to specifications for Measurement of Values.

Please refer to the City of Santa Ana and State of California website for all current COVID-19 Guidelines. 

BID DUE DATE & TIME:  Monday, February 27th, 2023 @ end of business day

Proposals may be emailed to the Estimating Department at estimating@ohnoconstruction.com or faxed to 619-278-8761. Quotes are required at least 2 hours prior to bid time. Proposals received after the Bid Due Date and Time will NOT be considered.

BID DOCUMENTS:

Bid documents are available for download from our website. To access these documents:

https://ohno.sharefile.com/home/shared/fo4b6721-cb0d-4bba-adfd-9bef0150b8ff

Enter Email           : ohnocc.ca@gmail.com

Enter Password    : Yosh1966*

 

Bid documents are provided for your reference only. All takeoff quantities provided by Ohno Construction are for your convenience only. Subcontractors and suppliers are responsible for obtaining all of the information necessary to provide a responsible and accurate quote.

STANDARD REQUIREMENTS:

By submitting a proposal, the bidder acknowledges and agrees to all of the following terms: Proposer has carefully examined ALL the bidding documents/Addenda and that, from his/her own investigation, they have satisfied themselves as to the nature and location of the work. Ohno’s listing of a subcontractor is not an acceptance of any or all of that subcontractor’s conditions, qualifications, exclusions, or exceptions included in the subcontractor’s bid proposal. Ohno is relying on the price submitted in the subcontractor’s proposal as an all-inclusive price for its trade scope found in the plans and specifications regardless of qualifying language in the proposal. Inconsistent bid terms and conditions shall be void. Break outs of any portion of work is permitted as long as specifically and conspicuously called out on proposal. If selected, proposer is prepared to sign a subcontract with Ohno per Ohno’s standard subcontract agreement. A copy of Ohno’s standard subcontract agreement is available at its office locations or upon written request. Ohno Construction reserves the right to request that performance and payment bonds assuring subcontractor’s obligations to Ohno in the amount of 100 percent of the bid to Ohno. Ohno will reimburse the bond premium at actual cost not to exceed 2%. The surety must be a California admitted surety. Insurance must name Ohno as additionally insured and be in an amount required by the specifications.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.