is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Concrete, Structural Steel Framing, Metal Stairs, Architectural Cabinets, Insulation, Roofing, Hollow Metal Doors and Frames, Wood Doors, Overhead Coiling Doors, Sectional Doors, Storefronts, Plastering, Tile Wall Finishes, Carpet, Painting, Markerboards, Tackboard, Signage, Toilet Accessories, Metal Lockers, Food Service Equipment, Roller Shades, Elevator, Fire Sprinklers, Plumbing, HVAC, Electrical.
Ripon USD - Agricultural Technology Center Increment #2 (Building)
Not Available
Ripon Unified School District
301 N. Acacia Ave., Ripon, CA, 95336
03-23-2023 at 02:00 PM
Pam Galbreath
209-838-7388
209-838-3960
1804 Jackson Ave, Escalon, CA, 95320
PROJECT DETAILS:
PROJECT DESCRIPTION: Lease Leaseback Project. General Contactor seeking sub bids only.
New two-story agricultural technology center at Ripon High School. Scope includes new Ag workshop, culinary arts kitchen, classrooms, offices, service elevator, restrooms and storage. Structural steel, metal deck and metal stud construction. Building envelope composed of cement plaster, metal siding, storefront and standing seam metal roof.
Pre-bid Job walk: Tuesday, March 7, 2023 at 9AM
Location: 301 N Acacia Ave., Ripon, CA 95336
Plans and Specs can be reviewed on our Website at www.ctbrayton.com under “Bidding”.
Please submit all bid proposals, questions and RFI’s to estimator@ctbrayton.com or fax to 209-838-3960.
Bid proposals emailed elsewhere may not be received in time to be considered.
All Bidders must review insurance requirements and include any additional costs in their cost proposals.
MEP Prequalification’s due to District at least five days prior to bid date - Any subcontractor work requiring C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 licenses must have current pre-qualified status with the Owner. Bidders must submit the prequalification application to the Owner by the date specified above. Bidders may obtain the prequalification application from the Owners Website.
DIR Registration requirements for all Public Works projects (SB854). The requirement to only use registered contractors and subcontractors on public works projects applies to all projects awarded on or after April 1, 2015.
a. All sub-tier subcontractors must be DIR registered contractors at all times during performance of the Work; and
b. Prospective subcontractors may only solicit sub-bids from and contract with lower-tier subcontractors who are DIR registered contractors.
AB-566 / SB-693 Skilled and Trained Workforce Requirements:
All subcontractors of any tier must comply with the requirements set forth in Education Code section 17407.5, including providing an enforceable commitment that all Subcontractors of any tier will use a “Skilled and Trained Workforce” as defined in Public Contract Code 2601(d). All Subcontractors are to carefully review all requirements set forth in Public Contract Code 2600-2603 before bidding the project.
Subcontracts will be awarded by the “Best Value Subcontractor Selection” process.
All responsive bidders will be scored according to the following format.
Best Value Subcontractor Selection: The following items will be graded on a point basis as indicated. Higher scores indicate a higher level of compliance in the opinion of the scorer. One scorer will be chosen to represent the Owner, Architect, and C.T. Brayton & Sons, Inc. The Subcontractor with the highest score will be considered the ‘Best Value’ and awarded a Subcontract accordingly.
50 Points Maximum Possible Score per Scorer.
All work performed on this project which falls under the recognized jurisdiction of the Carpenter’s Master Agreement for Northern California shall be performed by Union Carpenters.
This project is Prevailing Wage. Seeking DVBE Subcontractor/Supplier Participation.