Mercer-Fraser Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Consultants and professional services to provide; trucking, surveying, SWPPP preparation, inspections and reporting, preparing health and safety plans and reporting. Suppliers for temporary erosion control BMP’s, site fencing, geotextiles and geogrids, aggregates, precast concrete piling, steel pipe pile, form materials, precast concrete deck slabs, treated lumber and timber, drainage pipe, trail amenities, flangeway filler, timber crossties, signs and posts. Subcontractors for the following; demolition, clearing and grubbing, roadway striping, landscaping and erosion control, signs, railing, fencing, Traffic control, minor concrete, structural concrete, electrical lighting, reinforcing steel, pile driving and drilling, clearing and grubbing and asphalt dike.


PROJECT NAME:

Humboldt Bay Trail South

BID CONTRACT #:

715306

AWARDING AGENCY:

County of Humboldt

PROJECT LOCATION:

Between Eureka and Arcata in Humboldt County, Eureka, CA, 95501

BID DUE DATE:

03-14-2023 at 02:00 PM

OUTREACH COORDINATOR:

Cassie Coppini

TELEPHONE:

(707) 443-6371

FAX:

(707) 443-0277

ADDRESS:

200 Dinsmore Drive, Fortuna, CA, 95540

PROJECT DETAILS:

Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.