is seeking certified and qualified DVBE subcontractors and/or suppliers to provide selective demolition, hazardous materials abatement, concrete pavement, storm drainage systems, concrete rehabilitation, metal fabrications, fluid-applied roofing, sheet metal flashing, joint sealants, wood window rehabilitation, hollow metal doors and frames, FRP doors, door hardware, aluminum windows, glazing, gypsum board assemblies, elastomeric coatings, painting, signs, aluminum bleachers, HVAC, plumbing, fire sprinklers, electrical, lighting, fire alarm devices, athletic rubber surface tiles.
Balboa High School Viewing Stand Building Repairs - Phase 1
SFUSD PROJECT NO. 12269
SAN FRANCISCO UNIFIED SCHOOL DISTRICT
1000 Cayuga Avenue, San Francisco, CA, 94112
03-22-2023 at 11:00 AM
Kennedy Chan
(650) 557-1238
(650) 557-1239
1009 Terra Nova Blvd., Pacifica, CA, 94044
PROJECT DETAILS:
PLANS & SPECIFICATIONS WILL BE AVAILABLE ONLINE ON/AFTER MARCH 8, 2023, AS STATED IN THE NOTICE TO CONTRACTORS
The Project is generally described as, but not limited to, restoration and repairs of a viewing stand building involving: selective demolition, hazardous materials abatement, concrete pavement, storm drainage systems, concrete rehabilitation, metal fabrications, fluid-applied roofing, sheet metal flashing, joint sealants, wood window rehabilitation, hollow metal doors and frames, FRP doors, door hardware, aluminum windows, glazing, gypsum board assemblies, elastomeric coatings, painting, signs, aluminum bleachers, HVAC, plumbing, fire sprinklers, electrical, lighting, fire alarm devices, athletic rubber surface tiles.
Questions: Simon Reyes, at: reyess@sfusd.edu, or by calling (415) 265-4260.