is seeking certified and qualified DBE, MBE, WBE and UDBE subcontractors and/or suppliers to provide Traffic Control System, Flagging, Job Site Management, Prepare Water Pollution Control Program, Contractor Supplied Biologist, Clearing and Grubbing, Roadway Excavation, Structure Excavation (Bridge), Structure Excavation (Retaining Wall), Structure Backfill (Bridge), Structure Backfill (Retaining Wall), Imported Borrow, Embankment, Hydroseed, Class II Aggregate Base, HMA (Type A), 36” Cast-In-Drilled-Hole Concrete Piling, Structural Concrete Bridge Footing, Structural Concrete Bridge, Structural Concrete Retaining Wall, Lightweight Concrete, Drill and Bond Dowel (Chemical Adhesive), Joint Seal (MR ½”), Bar Reinforcing Steel (Bridge), Bar Reinforcing Steel (Retaining Wall), Furnish Steel Trusses, Erect Steel Trusses, Bridge Removal (Portion), Miscellaneous Metal (Bridge), Relocate Sign (Two-Post), Roadside Sign (One-Post), Hand Railing, 6” Thermoplastic Traffic Stripe, Paint Pavement Marking (1-Coat), Mobilization, Trucking, Material.
Crocker Bridge Bike & Pedestrian Passage
C21903
County of Sonoma Department of Transportation and Public Works
Crocker Road, Cloverdale, CA, 95425
04-04-2023 at 02:00 PM
Zach Rege
(707) 894-5143
(707) 894-5141
600 Santana Dr., Cloverdale, CA, 95425
PROJECT DETAILS:
WORK WILL BE BROKEN DOWN TO FEASIBLE UNITS. PLEASE SUBMIT A COPY OF YOUR CURRENT DBE CERTIFICATION WITH YOUR PROPOSAL.