is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN, LEVEL 2 CRITICAL PATH METHOD SCHEDULE, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, PORTABLE CHANGEABLE MESSAGE SIGN, AUTOMATED FLAGGER ASSISTANCE DEVICE, JOB SITE MANAGEMENT, PREPARE WPCP, STORM WATER ANNUAL REPORT, TEMP HYDRAULIC MULCH (BONDED FIBER MATRIX), TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP CONSTRUCTION ENTRANCE, TEMP CONCRETE WASHOUT, TREATED WOOD WASTE, CONTRACTOR-SUPPLIED BIOLOGIST, TEMP HIGH-VISIBILITY FENCE, CLEAR & GRUB, ROADWAY EXCAVATION, SHOULDER BACKING, DITCH EXCAVATION, ROLLED EROSION CONTROL PRODUCT, HYDROMULCH, HYDROSEED, CLASS 2 AGGREGATE BASE, HOT MIX ASPHALT, ASPHALT BINDER, GEOSYNTHETIC PAVEMENT INTERLAYER, TACK COAT, COLD PLANE ASPHALT CONCRETE PAVEMENT, STRUCTURAL CONCRETE, REINFORCED CONCRETE PIPE, BIOFILTRATION SOIL MEDIA, CONCRETE FLARED END SECTION, REMOVE CULVERT, REMOVE INLET, MISC IRON & STEEL, MARKERS, TREATMENT BEST MANAGEMENT PRACTICE MARKER, REMOVE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGNS, ROADSIDE SIGNS, INSTALL SIGNS, THERMOPLASTIC PAVEMENT MARKING (ENHANCED WET NIGHT VISIBILITY), THERMOPLASTIC TRAFFIC STRIPE (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, TRAFFIC MONITORING STATION SYSTEM
Roadway Excavation, Place HMA, Reinforced Concrete Pipe
01-0G6004
Caltrans
Route 65, Cleone, CA, 95437
04-04-2023 at 02:00 PM
Cassie Coppini
(707) 443-6371
(707) 443-0277
200 Dinsmore Drive, Fortuna, CA, 95540
PROJECT DETAILS:
Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.