is seeking certified and qualified DVBE, Los Angeles County LSBE, SBE and Micro Small Businesses (MSBE) and Veteran Business Enterprises (VBE) subcontractors and/or suppliers to provide Abatement-Haz Mat- Asbestos, Concrete and Rebar, Structural Steel, Vapor Barriers, Flash/Firestop, Joint Sealant, Aluminum Windows, Finishes Cement Plaster and Lath, Ceilings, Paints and Coatings, Paint Existing Facilities, Plumbing, HVAC, Electrical, Low Voltage, Fire Detection and Alarm, Earthwork/Fill Paving, Base, Slurry, Pavement Repair, AC Paving, Seal, Site Concrete Work, Markings, Chain Link Fence and Gates
SOTO ST. ES - CAMPUS WIDE HVAC UPGRADE (BEST VALUE)
Colin#10370680 | Contract No.: 2310032
Los Angeles Unified School District | BEST VALUE
1020 Soto Street, Los Angeles, CA, 90023
04-17-2023 at 02:00 PM
Johnny Pinner
7146966602
7148804828
7312 Walnut Ave, Buena Park, CA, 90620
PROJECT DETAILS:
This project will replace the antiquated and deteriorated HVAC systems in the Main Building and one relocatable bungalow. The scope includes the demolition of the existing hot and chilled water system on the first and second floors of the administration building, its associated fan coil units, piping and cooling tower. The project includes the installation of seventeen (17) self-contained packaged heat pump units in the classrooms on the first and second floor to be powered by a new transformer. Four new split system FCU's in the first-floor corridor will serve the administration offices. A new outdoor chiller plant enclosure will house the VRF system FCU with heat recovery unit. All existing FCU's ductwork and abandoned systems will be demolished above the existing T-Bar ceiling on the first and second floors.
1) Phase 1 - Demo of existing FCU's, ductwork and abandoned systems above the existing T-Bar ceiling at 2nd floor corridor; installation of new outdoor chiller plant enclosure.
2) Phase 2- Installation of self-contained packaged heat pump units in the classrooms on the first and second floor; installation of new transformer.
3) Phase 3- Demo of existing FCU's, ductwork and abandoned systems above the existing T-Bar ceiling at 1st floor corridor. Removal of existing chiller and boiler systems, and restoration of existing chiller enclosure.
Bidders should note that LAUSD requires all Mechanical, Electrical, and Plumbing Contractors (MEP Trades) to be District Qualified. Deadline for MEP subcontractors to be prequalified by the OWNER: Monday, April 10, 2023. Bidder can only list MEP subs that are prequalified by the OWNER as of this date..
This project is subject to the District's Small Business enterprise (SBE), including Micro-Small Business Enterprises, and the recognized Veteran Business Enterprise Program (also Disabled Veteran Business Enterprises-DVBE). PINMOR will be actively seeking SBE's & certified VBE/DVBE to meet the percentage goal requirements.
This project is also subject to compliance monitoring and enforcement by the Department of Industrial Relations (DIR) and the LAUSD's DIR approved District Labor Compliance Program. There is also a Project Stabilization Agreement (PSA) that contracted subcontractors and contractors will be required to participate in. As part of this agreement, 50% of one's workforce is required as a goal to be District resident workers. There is also a We-Build hiring program, sponsored by the District, that we anticipate our selected subcontractors and tier-contractors to paticipate in.
Selected Bidder, and all of their contracted subcontractors and tier contractors, will be required to participate in a mandatory Owner Controlled Insurance Program (OCIP) on this project; There are specific safety EMR eligibility requirements to be able to participate.
All trades are expected to be bondable and prepared to furnish 100% Payment and Performance Bonds from an admitted surety for their bid. [Bond premium costs are to included in your bid as a separate item.] This firm will, at our discretion, reserve the right to waive the above requirements for such bond, and to permit other security as a substitute, or to accept alternate guarantees in lieu of. We will help assist interested subcontractors in Bonding, Lines of Credit, and Insurance needs, if required. However, please contact us prior to our bid date to discuss.
We will negotiate in good faith for all trade selections. Subcontractors/Suppliers selected will be required to agree to, and sign, our standard Master Subcontractor Agreement (including payment terms) a copy of which is available our our offices. No modifications to the contract will be permitted. Plan & Specification Hard copies are also available for review/takeoff at our Main Office during regular business hours: M-F, 7:30 am -4:30 Pm. If you have any questions please do not hesitate to contact us.
Please Read all Specification and General & Supplemental Conditions carefully for any and all night time requirements, as applicable. These include Special Section 007300 Work Hours 3:00 PM to 11:00 PM. Including Section 11100-Summary of Work, Sections 011216 - Phasing and Section 011219 Phasing of the Work Appendix A., for further information.
Pre-Bid clarifications are due no later than April 10th, 2023. Please use the RFC form provided in Section 009110. Please submit your proposal accordingly.
Time of Completion: 587 Calendar Days. Estimated District Contract Bond Estimate: $ 3.614 Million.
Again, It is important to read Section 011100-Summary of Work.
Please be aware and consult the General Conditions, Supplemental Conditions, and any General Requirements regarding Milestones and Liquidated Damages.