Angeles Contractor, Inc

is seeking certified and qualified ACDBE, DBE, DVBE, LGBTBE, MBE, SBE and WBE subcontractors and/or suppliers to provide DIVISION 2 – EXISTING CONDITIONS Demolition No hazmat material or contaminated soils are anticipated. DIVISION 31 - EARTHWORK Earthwork SECTION 31 00 00 EARTHWORK SECTION 31 10 00 CLEARING, GRUBBING AND DEMOLITION DIVISION 32 - EXTERIOR IMPROVEMENTS Pavement Marking SECTION 32 00 00 MISCELLANEOUS CIVIL IMPROVEMENTS AC paving Site Utilities Site concrete DIVISION 3 – CONCRETE Concrete DIVISION 5 – METALS Metals Miscellaneous Metal DIVISION 13 - Special Construction Scalehouse SECTION 13 34 19 PREFABRICATED SCALEHOUSE DIVISION 26 - ELECTRICAL Electrical SECTION 16010 GENERAL ELECTRICAL REQUIREMENTS SECTION 16060 GROUNDING AND BONDING SECTION 16073 HANGERS AND SUPPORTS FOR ELECTRICAL SYSTEMS SECTION 16075 ELECTRICAL IDENTIFICATION SECTION 16120 LOW VOLTAGE WIRE AND CABLE SECTION 16130 RACEWAYS AND BOXES SECTION 16135 CABINETS AND ENCLOSURES SECTION 16140 WIRING DEVICES SECTION 16442 PANELBOARDS SECTION 16511 INTERIOR LIGHTING DIVISION 28 - SAFETY & SECURITY Protection system SECTION 28 42 00 BUILDING PROTECTION SYSTEM


PROJECT NAME:

North Scalehouse Improvements (Rebid)

BID CONTRACT #:

PWG123-SOLID-4946

AWARDING AGENCY:

San Bernardino County

PROJECT LOCATION:

Mid-Valley Sanitary Landfill, Rialto, CA, 92377

BID DUE DATE:

05-03-2023 at 10:00 AM

OUTREACH COORDINATOR:

Amir Markazi

TELEPHONE:

6269233800

FAX:

6269233801

ADDRESS:

783 Phillips Drive, City of Industry, CA, 91748

PROJECT DETAILS:

ACI is relying on the price submitted in a subcontractor's proposal as an all-inclusive price for its trade scope per the plans and specifications regardless of any qualifying proposal language. No substitutions will be accepted. ACI's listing of a subcontractor is not an acceptance of all or any of that subcontractor's conditions, qualifications, exclusions or exceptions included in the subcontractor's bid. The subcontractor agrees that its bid will remain valid for the same period of time that the prime contractor's bid must remain valid with the owner, as specified in the project's specifications. Each listed subcontractor must execute ACl's standard subcontract agreement if ACI is awarded the project; the standard subcontract is available for review on ACI's website and at ACI's office. PLEASE TAKE NOTICE that any subcontractor whose bid is relied upon by ACI must provide 100% performance and payment bonds issued by an admitted surety in an amount not less than its bid amount; the expense of the bonds is to be borne by the subcontractor. The bonds must guarantee prompt and faithful performance of the subcontract and the payment of all claims for labor and materials furnished or used in and about the work to be done and performed under the subcontract. Conditions, qualifications, exclusions or exceptions to the bond requirements contained in a subcontractor's bid are not enforceable. Such bonds must be furnished to ACI within five (5) business days of the project being awarded to ACI. ACI at its sole discretion, reserves the right to waive the requirements of such bonds, but only in a writing signed by ACl At the discretion of ACI, any listed subcontractor that withdraws its bid after ACI submits its bid to the owner will be responsible for the difference in price for such scope of work charged by the replacement subcontractor. Note that ACI is a signatory to the Painters unions; subcontractors must adhere to provisions of the applicable Master Labor Agreement(s) applicable to their trade. We are no longer signatory to the carpenters union.

PDF ATTACHMENTS:

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.