Mercer-Fraser Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, TYPE III BARRICADE, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGN, JOB SITE MANAGEMENT, PREPARE STORM WATER POLLUTION PREVENTION PLAN, STORM WATER ANNUAL REPORT, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, STREET SWEEPING, TEMP CONCRETE WASHOUT, BIRD EXCLUSION DEVICES, ROADSIDE CLEARING, CULTIVATION, SOIL AMENDMENT, SOD, MAINTAIN EXISTING PLANTED AREAS, PLANT ESTABLISHMENT WORK, GRAVEL MULCH, WOOD MULCH, CHECK & TEST EXISTING IRRIGATION FACILITIES, OPERATE EXISTING IRRIGATION FACILITIES, CONTROL & NEUTRAL CONDUCTORS, REMOTE CONTROL VALVE, WYE STRAINER ASSEMBLY, POP-UP SPRINKLER ASSEMBLY, PLASTIC PIPE, BALL VALVE, HYDROMULCH, HYDROSEED, AGGREGATE BASE, REMOVE ASPHALT CONCRETE DIKE, DETECTABLE WARNING SURFACE, MINOR CONCRETE, REMOVE CONCRETE SIDEWALK, CHAIN LINK FENCE, WROUGHT IRON FENCE & GATE, REMOVE CHAIN LINK FENCE, REMOVE ROADSIDE SIGN, FURNISH SINGLE SHEET ALUMINUM SIGNS, ROADSIDE SIGNS, THERMOPLASTIC TRAFFIC STRIPE, METHYL METHACRYLATE PAINT TRAFFIC STRIPE CROSSWALK AND PAVEMENT MARKING, BUILDING WORK


PROJECT NAME:

Upgrade Water & Wastewater System at Roadside Rest Area

BID CONTRACT #:

06-0V7604

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

Tulare & Fresno Counties, Kingsburg, CA, 93631

BID DUE DATE:

05-02-2023 at 02:00 PM

OUTREACH COORDINATOR:

Cassie Coppini

TELEPHONE:

(707) 443-6371

FAX:

(707) 443-0277

ADDRESS:

200 Dinsmore Drive, Fortuna, CA, 95540

PROJECT DETAILS:

Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.