PINMOR CONSTRUCTION LLC

is seeking certified and qualified DVBE, Los Angeles County LSBE, SBE and Micro Small Businesses (MSBE) and Veteran Business Enterprises (VBE) subcontractors and/or suppliers to provide Concrete, Mechanical, Electrical, HVAC, Paving, Plumbing, Roofing, Structural Steel, Metal Studs, Sitework, Demolition, Retaining Walls, Underground Parking, Landscaping, Hardscape, Flooring, Playground Areas, Food Service, Sewer, Water, IT Convergence, Painting, Thermal Moisture Protection, Finishes, Windows, Doors, Curtain Walls, Fire Suppression-Sprinkler, Communications, Ornamental Fencing, Chain Link Fence, ADA Ramps, Select Carpentry, and Gates


PROJECT NAME:

DELEVAN ES - CLASSROOM REPLACEMENT PROJECT - STEP 2 - REVISED - PINMOR HAS NOW WITHDRAWN FROM THIS BID

BID CONTRACT #:

2310046

AWARDING AGENCY:

Los Angeles Unified School District - Facilities Construction Contracts (Best Value)

PROJECT LOCATION:

4168 W. Avenue 42, Los Angeles, CA, 90065

BID DUE DATE:

08-30-2023 at 02:00 PM

OUTREACH COORDINATOR:

Johnny Pinner

TELEPHONE:

7146966602

FAX:

7148804828

ADDRESS:

7312 Walnut Ave, Buena Park, CA, 90620

PROJECT DETAILS:

Project Details

 

Message-UPDATE: PINMOR has now WITHDRAWN from this BID.  Thank you for considering us.

Message- UPDATE: The NEW bid date is being pushed to: 

Wednesday August 30, 2023, at 2:00 PM

______________

Message- UPDATE

Major Trades Approved Subcontractor Listing -- Released 7-21-2023 

Go to the Documents File to find the list.

Documents  
Project Files

 

 

PlansTakeoff

DELEVAN ES - CLASSROOM REPLACEMENT PROJECT - STEP 2 - REVISED

Johnny Pinner | johnny@pinmor.com | P: (714) 696-6602 | F: (714) 880-4828

Bid Date

New Bid Date - 8/17/23

Last Day for RFC's - 7/21/23

IMPT NOTE / Message 6-22-2023:   LAUSD has offered a Job Walk for all Subcontractors on June 29, 2023 form 10:00 AM - 1:00 PM

It is Non-Mandatory but strongly recommended. The surrounding streets and neighborhood are going to impede access in and out of the site. This will need to be taken into consideration when preparing your bid.

Please email Johnny Pinner, if you intend on attending at johnny@pinmor.com. Also, complete and bring with you a copy of Exhibit “E” - SITE VISIT LIABILITY RELEASE FORM. This has been uploaded in the Documents File. You will not be able to attend the walk without this form.

Job Walk

(06/29/2023: See Above Impt Note: for Subcontractor JW)

06/15/2023 10:00AM

Address

4168 W. AVENUE 42
LOS ANGELES, CA 90065

Status

Actively Bidding

Bldg. Sq. Ft.

--

Site. Sq.Ft.

--

Bldg. Count

--

Stories

2

Const. Type

New Construction

Bldg. Type

Institutional-Schools

Dollar Size

$ 35 Mil 

Bid Type

Prevailing Wage

Sector

GC

Scope/Comments

IMPORTANT:

Time of completion is 1,335 Calendar Days.

Attached Docs:

Specification Section 011100 - Summary Of Work

Specification Sections 011216 - Phasing Of The Work and 011219 - Phasing Of The Work Appendix A, for further information.

Pre-Bid Clarifications are now due no later than July 21, 2023. Please use the attached RFC form provided in Section 009110.

There is 1 Alternate. Please see Specification Section 011100 - Exhibit A to check if your scope is affected.

DESCRIPTION OF WORK:  This project entails the construction of a new 2-story classroom building with 15 classrooms, support spaces, food services facilities, and underground parking. The project will remove 11 
classrooms located in relocatable buildings and the existing food service hot shack. In order to 
support the new facilities, site upgrades will include the replacement of the retaining wall along 
the eastern and southern portion of the site as well as enhancements to landscape, hardscape, 
parking, and playground areas. The project will also address upgrades to aging infrastructure 
including sewer, water, IT convergence, and electrical, as required. Additionally, seven interim 
classrooms and one sanitary building will be provided to support the classroom demands during 
construction. Project includes exterior painting of all existing buildings to remain (Alternate 
Add)

Bidders should note that LAUSD requires all mechanical, electrical, and plumbing contractors (MEP subcontractors trades) to be District prequalified. Pre-Qualifications are due to the district no later than July 13, 2023. 

This project is subject to the Small Business Enterprise (SBE), including Micro-Small Business Enterprise (MSBE), certification participation program, and also the recognized Veteran Business Enterprise (VBE) program.  PINMOR will be actively seeking certified SBE's, MSBE's, VBE's to meet the percentage goal requirements."

This project is also subject to compliance monitoring and enforcement by the department of Industrial Relations (DIR) and the LAUSD's DIR approved District Labor Compliance Program. There is also a Project Stabilization Agreement (PSA) that contracted subcontractors and contractors will be required to participate in. As part of this agreement, 50% of one's workforce is required as a goal to be district resident workers. There is also a We- Build hiring program, sponsored by the district, that we anticipate our selected subcontractors and tier-contractors to participate in.

Selected Bidder, and all of their contracted subcontractors and tier contractors, will be required to participate in a mandatory Owner Controlled Insurance Program(OCIP) on this project; There are specific safety EMR eligibility requirements to be able to participate.

All trades are expected to be bondable and prepared to furnish 100% Payment and Performance bonds from an admitted surety for their bid. [Bond premium costs are to be included in your bid as a separate item.] This firm will, at our discretion, reserve the right to waive the above requirements for such bond, and to permit other security as a substitute, or to accept alternate guarantees in lieu of. We will help assist interested subcontractors in Bonding, lines of credit, and insurance needs, if required. However, please contact us prior to our bid date to discuss.

We will negotiate in good faith for all trade selections. Subcontractors/Suppliers selected will be required to agree to, and sign, our standard Master Subcontractor Agreement (including payment terms) a copy of which is available at our offices. No modifications to the contract will be permitted. Hard copies are also available for review/takeoff at our main office during regular business hours, M-F, 7:30 am - 4:30 pm. If you have any questions please do not hesitate to contact us.

 

PINMOR Construction was Short-Listed for the Delevan ES - Classroom Replacement Project, via Step 1. We are now in the Step 2 phase, Subcontractor Statement of Qualifications.

Date Due to LAUSD - 06/22/23: The RFQ requires the shortlisted bidders to name a minimum of one (1) subcontractor(s) for each trade specified below. Attached is Page 11 from the RFQ detailing the information required from each sub. The Subcontractor's Statement of Qualifications, attached, is to be completed and returned to johnny@pinmor.com, no later than 06/21/23, to be nominated for this project. Please list all Divisions that apply to your typical scope items.

Division 3 – Concrete (Structural Concrete, Stressing Tendons, and Formwork only)
Division 5 – Structural Steel (Steel Fabrication and Erection), Structural Metal Stud
Division 7 – Thermal and Moisture Protection
Division 8 – Openings (Curtain Walls, Windows, and Doors)
Division 9 – Finishes (Plaster and Gypsum Board)
Division 21 – Fire-Suppression Sprinkler System
Division 22 – Plumbing
Division 23 – Heating, Ventilating, and Air Conditioning
Division 26 – Electrical
Division 27 – Communications
Division 32 – Ornamental Fence, Chain link Fence and Gate

Attached Docs:

Subcontractor's Statement of Qualifications

Page 11 from the RFQ

MPORTANT:

Time of completion is 1,335 Calendar Days.

II.   PROJECT SCOPE OF WORK:

This project entails the construction of a new 2-story classroom building with 15 classrooms, 
support spaces, food services facilities, and underground parking. The project will remove 11 
classrooms located in relocatable buildings and the existing food service hot shack. In order to 
support the new facilities, site upgrades will include the replacement of the retaining wall along 
the eastern and southern portion of the site as well as enhancements to landscape, hardscape, 
parking, and playground areas. The project will also address upgrades to aging infrastructure 
including sewer, water, IT convergence, and electrical, as required. Additionally, seven interim 
classrooms and one sanitary building will be provided to support the classroom demands during 
construction. Project includes exterior painting of all existing buildings to remain (Alternate 
Add)


III.   PROJECT CONSTRUCTION PHASE:

Three (3) Construction Phases (See attached Phasing Dated 04.25.2023) as follows:

PHASE 1A
Duration: 11 Mo. 20Days (355 CD)
- Mobilization and Site Investigation
-Removal of Sanitary Building, Storage, Lath House, and Tool Shed
-Removal of Trees (scheduled for Demo)
-Construction of 2 ADA Ramps
-Construction of UG Utilities for Interim Housing including sanitary sewer, water, and electrical 
utilities. (Temp or Permanent power intercept/ feed to Classrooms 1&2)
-Construction of Interim Housing (7 Classrooms, Trash Enclosure, and Sanitary Building
-Construction of temporary trailers

  Again, All trades are expected to be bondable and prepared to furnish 100% Payment and Performance Bonds from an admited surety for their bid. [Bond premium costs are to be included in your bid as a separate item.] This firm will, at our sole discretion, reserve the right to waive the above requirements for such bond and to permit other security as a substitute, or to accept alternate guarantees in lieu of. We will help assist interested subcongtractors in Bonding, lines of credit, and insurance needs, if required. However, please contact us prior to our bid date to discuss. We will negotiate in good faith for all trade selections. Subcontractors/Suppliers selected will be required to agree to,and sign, our standard Master Subcontractor Agreement (including payment terms) a copy of which is available at our offices. No modifications to the contractwill be permitted. Hard copy Plans & Specs are also available for review/takeoff at our main office during regular business hours, M-F, 7:30 am - 4:30 PM. 

                                ---WE ARE AN EQUAL OPPORTUNITY EMPLOYER--

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.