Thompson Builders Corporation

is seeking certified and qualified DVBE and SBE subcontractors and/or suppliers to provide DIVISION 02 – EXISTING CONDITIONS Section 02 26 00 Existing Conditions- Hazardous Materials Assessment 2 02 30 00 Subsurface Investigation 02 41 00 Demolition 02 80 01 Haz Mat Abatement Work Plan 02 82 33 Removal and Disposal of ACM 02 83 33 Removal and Disposal of Material Containing Lead 02 84 33 Removal and Disposal of PCB and Mercury Containing Materials DIVISION 03 - CONCRETE Section 03 11 00 Concrete Forming 03 20 00 Concrete Reinforcing 03 30 00 Cast-in-Place Concrete DIVISION 04 - MASONRY Section 04 22 00 Concrete Unit Masonry DIVISION 05 - METALS Section 05 12 00 Structural Steel Framing 05 31 00 Steel Decking 05 50 00 Metal Fabrications DIVISION 06 - WOOD, PLASTICS AND COMPOSITES Section 06 10 00 Rough Carpentry 06 15 23 Laminated Wood Decking 06 17 33 Wood I-Joists 06 17 53 Shop-Fabricated Wood Trusses 06 18 00 Manufactured Lumber 06 41 00 Architectural Wood Casework 06 64 00 Plastic Paneling DIVISION 07 - THERMAL AND MOISTURE PROTECTION Section 07 13 26 Self-Adhering Sheet Waterproofing 07 19 19 Silicone Water Repellents 07 21 00 Thermal Insulation 07 25 00 Weather Barriers 07 26 50 Vapor Emission Control System 07 31 13 Asphalt Shingles 07 46 46 Mineral-Fiber Cement Siding 07 54 23 Thermoplastic-Polyolefin Roofing 07 62 00 Sheet Metal Flashing and Trim 07 72 33 Roof Hatches 07 84 00 Firestopping 07 92 00 Joint Sealants DIVISION 08 - OPENINGS Section 08 11 13 Hollow Metal Doors and Frames 08 14 00 Wood Doors 08 31 00 Access Doors and Panels 08 33 23 Exterior Overhead Coiling Doors 08 33 23.13 Interior Overhead Coiling Doors 08 41 13 Aluminum-Framed Entrances and Storefronts 08 51 13.16 Double Hung Aluminum Windows 08 56 19 Transaction Windows 08 62 00 Unit Skylights 08 62 23 Tubular Skylights 08 71 00 Door Hardware 08 71 13 Automatic Door Operators 08 81 00 Glass Glazing 08 88 13 Fire Rated Glazing 08 91 19 Fixed Louvers DIVISION 09 - FINISHES Section 09 22 26.23 Metal Suspension Systems 09 29 00 Gypsum Board 09 30 00 Tiling 09 51 13 Acoustical Panel Ceilings 09 65 00 Resilient Flooring 09 65 66 Resilient Athletic Flooring 09 68 13 Tile Carpeting 09 68 16 Sheet Carpeting 09 77 10 Sanitary Wall and Ceiling Finishes 09 81 00 Acoustic Insulation 09 84 36 Sound Absorbing Wall and Ceiling Panels 09 91 00 Painting DIVISION 10 – SPECIALTIES Section 10 11 00 Visual Display Surfaces 10 14 00 Signage 10 21 13.33 Solid Phenolic Toilet Compartments 10 22 26.33 Folding Panel Partitions 10 26 00 Wall and Door Protection 10 28 13 Toilet Accessories 10 44 00 Fire Protection Specialties 10 51 00 Lockers 10 73 16 Building Canopies 10 73 23 Site Canopies 10 75 00 Flagpoles 10 90 00 Miscellaneous Specialties DIVISION 11 - EQUIPMENT Section 11 31 13 Kitchen Appliances 11 31 23 Laundry Appliances 11 40 00 Foodservice Equipment 11 66 00 Athletic Equipment DIVISION 12 - FURNISHINGS Section 12 24 13 Roller Window Shades 12 48 19 Entrance Grating System DIVISION 21 - FIRE SUPPRESSION Section 21 01 10 Operation and Maintenance of Water Based Fire Suppression Systems 21 05 00 Common Works Results for Fire Suppression 21 05 13 Common Motor Requirements for Fire Suppression Equipment 21 05 23 General Duty Valves for Water Based Fire Suppression Systems 21 05 29 Hangers and Supports for Fire Suppression Piping and Equipment 21 05 48 Vibration and Seismic Controls for Fire Suppression Piping and Equipment 21 07 00 Fire Suppression Systems Insulation 21 07 16 Fire Suppression Systems Equipment Insulation 21 07 19 Fire Suppression Systems Piping Insulation 21 13 13 Wet Pipe Sprinkler System 21 31 00 Fire Pumps 21 41 00 Storage Tanks for Fire-Suppression Water DIVISION 22 - PLUMBING Section 22 05 00 Basic Plumbing Materials and Methods 22 05 48 Vibration Isolation for Plumbing Piping and Equipment 22 05 49 Seismic Restraint for Plumbing Piping and Equipment 22 05 93 Plumbing Testing, Adjusting and Balancing 22 07 00 Plumbing Insulation 22 08 00 Commissioning of Plumbing 22 10 00 Plumbing Piping, Valves and Specialties 22 11 23 Pumps and Specialties 22 11 25 Domestic Hot Water Recirculation 22 30 00 Plumbing Equipment 22 34 00 Domestic Hot Water Heating Equipment 22 40 00 Plumbing Fixtures 22 68 14 Above Ground Propane Storage Tank and Accessories DIVISION 23 - HEATING, VENTILATING, AND AIRCONDITIONING (HVAC) Section 23 05 00 Basic HVAC Materials and Methods 23 05 48 Vibration Isolation for Piping, Ductwork, and Equipment 23 05 49 Seismic Restraint for Piping, Ductwork, and Equipment 23 05 93 Testing, Adjusting, and Balancing 23 07 13 Duct Insulation 23 07 19 HVAC Piping Insulation 23 08 00 Commissioning of Heating, Ventilation and Air Conditioning 23 09 00 Building Automation System (BAS) Controls 23 23 00 Refrigerant Piping Systems 23 31 13 Air Distribution 23 34 13 Fans and Vents 23 34 18 Ceiling Mounted Circulation Fans 23 73 33 Make-Up Air Units 23 74 13 Packaged HVAC Units (Up to 25 Tons) 23 81 45 Split Heat Pump Units 23 81 58 Variable Refrigerant Flow Heat Pump Systems DIVISION 26 - ELECTRICAL Section 26 05 00 Basic Electrical Requirements 26 05 19 Low Voltage Electrical Power Conductors and Cables 26 05 26 Grounding and Bonding for Electrical Systems 26 05 29 Hangers and Supports for Electrical Systems 26 05 53 Identification for Electrical Systems 26 05 73.13 Short-Circuit Studies 26 05 73.16 Coordination Studies 26 05 73.19 Arc-Flash Hazard Analysis 26 08 00 Commissioning of Electrical 26 22 00 Low-Voltage Transformers 26 24 13 Switchboards 26 24 16 Panelboards 26 27 26 Wiring Devices 26 28 13 Fuses 26 28 16 Enclosed Switches and Circuit Breakers 26 31 00 Photovoltaic Collectors 26 32 13 Engine Generators 26 33 23.11 Central Battery Equipment for Emergency Lighting 26 43 13 Surge Protection for Low-Voltage Electrical Power Circuits 26 49 50 Transfer Switches 26 51 19 LED Interior Lighting 26 56 19 LED Exterior Lighting DIVISION 27 - COMMUNICATIONS Section 27 05 26 Grounding and Bonding for Communications Systems 27 05 28 Pathways for Communications Systems 27 05 28.28 Firestopping for Communications Cabling 27 05 36 Cable Trays for Communication Systems 27 05 44 Sleeves and Sleeve Seals for Communications Pathways and Cabling 27 11 00 Communications Equipment Room Fittings 27 13 00 Communications Backbone Cabling 27 15 00 Communications Horizontal Cabling 27 41 00 Audio/Video and Control Systems DIVISION 28 - ELECTRONIC SAFETY AND SECURITY Section 28 01 00 Security General Requirements 28 05 13 Security Wire and Cable 28 10 00 Security Management System 28 30 00 Security Video Management System 28 46 21.11 Addressable Fire Alarm Systems DIVISION 31 - EARTHWORK Section 31 00 00 Earthwork 31 23 33 Trenching and Backfilling 31 31 16 Termite Control DIVISION 32 - EXTERIOR IMPROVEMENTS Section 32 08 00 Commissioning of Irrigation 32 12 00 Asphalt Concrete Paving 32 16 00 Site Concrete Pavement 32 17 26 Tactile Warning Surfacing 32 31 13 Chain Link Fences and Gates 32 84 00 Planting Irrigation 32 90 00 Planting 32 92 00 Native Hydroseed DIVISION 33 - UTILITIES Section 33 00 00 Site Utilities 33 40 00 Site Drainage Utilities


PROJECT NAME:

New Residential Center, Greenwood

BID CONTRACT #:

22-153659

AWARDING AGENCY:

Department of General Services

PROJECT LOCATION:

411 California 193, Greenwood, CA, 95635

BID DUE DATE:

07-26-2023 at 02:00 PM

OUTREACH COORDINATOR:

Leah Oba

TELEPHONE:

4154568972

FAX:

Not Available

ADDRESS:

5400 Hanna Ranch Road, Novato, CA, 94945

PROJECT DETAILS:

*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers’ Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.
TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our
estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies
and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder’s Exchanges, in our office at 5400 Hanna Ranch Road Novato, Monday through Friday from 7:30 AM to 4:00 PM. Plans and specifications may be emailed upon request or downloaded from the following link:

https://www.dropbox.com/scl/fo/y8zq7krld0853z6niwf0q/h?dl=0&rlkey=g9hok59esr5opph0t001uy79w


Thompson Builders Corporation is an Equal Opportunity Employer
Contact: Leah Oba
PHONE: (415) 456-8972 FAX: (415) 459-0665
EMAIL: bids@tbcorp.com

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.