is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demo, Concrete, Masonry, Structural Steel, Metal Fab., Metal Ladders and Stairs, Decorative Metal Railings, Wood Paneling, Wall Paneling, Roofing, Doors and Frames, Overhead Coiling Doors, Door Hardware, Glazing, Gyp board, Tile, Carpet, Painting, Markerboards, Signage, Partitions, Toilet Accessories, Casework, Shades, Telescoping Bleachers, Electric Traction Elevators, Fire Suppression, Plumbing, HVAC, Electrical, Communications, Fire Alarm System, Earthwork, Irrigation and Landscape, Utilities.
MUSD East Union High School Additions
Not Available
Manteca Unified School District
1700 Union Rd, Manteca, CA 95336, Manteca, CA, 95336
08-08-2023 at 02:00 PM
Pam Galbreath
209-838-7388
209-838-3960
1804 Jackson Ave, Escalon, CA, 95320
PROJECT DETAILS:
PROJECT DESCRIPTION: Lease Lease-back project. Sub bids only.
Pre-bid Job walk: Wednesday, July 12, 2023 at 10:00 AM. Location: 1700 Union Rd, Manteca, CA 95336. Meet in front of school.
Plans and Specs can be reviewed on our Website at www.ctbrayton.com under “Bidding”.
PlanGrid Software and mobile devices (Android, iOS, Windows) will be utilized by the Owner, Architect, Contractor, and Subcontractors (Construction Team), throughout the Project. Each Construction Team member is required to have their own PlanGrid license in order to access and collaborate with the project plans and associated documents.
RFI’s due by Friday, July 28, 2023.
Please submit all bid proposals, questions and RFI’s to estimator@ctbrayton.com or fax to 209-838-3960. Bid proposals emailed elsewhere may not be received in time to be considered.
All Bidders must review insurance requirements and include any additional costs in their cost proposals.
All MEP Subcontractors need to be prequalified with the District prior to bid date. - Any subcontractor work requiring C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 licenses must have current pre-qualified status with the Owner. Bidders must submit the prequalification application to the Owner by the date specified above. Bidders may obtain the prequalification application from the Owners Website. https://www.mantecausd.net/Page/2461
DIR Registration requirements for all Public Works projects (SB854). The requirement to only use registered contractors and subcontractors on public works projects applies to all projects awarded on or after April 1, 2015.
a. All sub-tier subcontractors must be DIR registered contractors at all times during performance of the Work; and
b. Prospective subcontractors may only solicit sub-bids from and contract with lower-tier subcontractors who are DIR registered contractors.
AB-566 / SB-693 Skilled and Trained Workforce Requirements: All subcontractors of any tier must comply with the requirements set forth in Education Code section 17407.5, including providing an enforceable commitment that all Subcontractors of any tier will use a “Skilled and Trained Workforce” as defined in Public Contract Code 2601(d). All Subcontractors are to carefully review all requirements set forth in Public Contract Code 2600-2603 before bidding the project.
Subcontracts will awarded by the “Best Value Subcontractor Selection” process.
All responsive bidders will be scored according to the following format.
Best Value Subcontractor Selection: The following items will be graded on a point basis as indicated. Higher scores indicate a higher level of compliance in the opinion of the scorer. One scorer will be chosen to represent the Owner, Architect, and C.T. Brayton & Sons, Inc. The Subcontractor with the highest score will be considered the ‘Best Value’ and awarded a Subcontract accordingly.
50 Points Maximum Possible Score per Scorer.
All work performed on this project which falls under the recognized jurisdiction of the Carpenter’s Master Agreement for Northern California shall be performed by Union Carpenters.
This project is Prevailing Wage. Seeking DVBE Subcontractor/Supplier Participation.