Mercer-Fraser Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, FLASHING ARROW SIGN, TEMP TRAFFIC STRIPE, CHANNELIZERS, PORTABLE RADAR SPEED FEEDBACK SIGN SYSTEMS, TEMP BARRIER SYSTEM, PORTABLE CHANGEABLE MESSAGE SIGNS, ALTERNATIVE TEMPORARY CRASH CUSHION, PREPARE WPCP, TEMP HYDRAULIC MULCH, TEMP COVER, TEMP CHECK DAM, TEMP DRAINAGE INLET PROTECTION, TEMP FIBER ROLL, TEMP GRAVEL BAG BERM, TEMP CONCRETE WASHOUT, TREATED WOOD WASTE, SHOULDER BACKING, IMPORTED BORROW, WOOD MULCH, FINISHING ROADWAY, CLASS 2 AGGREGATE BASE, CRACK TREATMENT, SEGMENT CORRECTION, REPLACE ASPHALT CONCRETE SURFACING, HOT MIX ASPHALT, RUBBERIZED HOT MIX ASPHALT, ASPHALT BINDER, GEOSYNTHETIC PAVEMENT INTERLAYER, DATA CORE, PLACE HOT MIX ASPHALT DIKE (TYPE A, C, E, F), TACK COAT, REMOVE ASPHALT CONCRETE DIKE, COLD PLANE ASPHALT CONCRETE PAVEMENT, ENTRANCE TAPER, REMOVE ENTRANCE TAPER, REMOVE OVERSIDE DRAIN, REMOVE PAVEMENT MARKERS, REMOVE DELINEATOR, DELINEATORS, GUARD RAILING DELINEATOR, PAVEMENT MARKERS, OBJECT MARKERS, REMOVE MARKERS, MIDWEST GUARDRAIL SYSTEM, VEGETATION CONTROL (MINOR CONCRETE), TRANSITION RAILING, END ANCHOR ASSEMBLY, ALTERNATIVE IN-LINE TERMINAL SYSTEMS, CONCRETE BARRIER TRANSITION, REMOVE GUARDRAIL, REMOVE CONCRETE BARRIER, THERMOPLASTIC TRAFFIC STRIPING (ENHANCED WET NIGHT VISIBILITY), REMOVE THERMOPLASTIC TRAFFIC STRIPE, RUMBLE STRIP (ASPHALT CONCRETE PAVEMENT), MAINTAINING EXISTING TRAFFIC MANAGEMENT SYSTEM ELEMENTS DURING CONSTRUCTION, LIGHTING SYSTEM, REMOVING LIGHTING SYSTEMS


PROJECT NAME:

Place RHMA, Replace Asphalt Concrete & Concrete Barrier Transition

BID CONTRACT #:

01-0H5604

AWARDING AGENCY:

Caltrans

PROJECT LOCATION:

HWY 101/299 Separation, Arcata, CA, 95521

BID DUE DATE:

07-20-2023 at 02:00 PM

OUTREACH COORDINATOR:

Cassie Coppini

TELEPHONE:

(707) 443-6371

FAX:

(707) 443-0277

ADDRESS:

200 Dinsmore Drive, Fortuna, CA, 95540

PROJECT DETAILS:

Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.