Mercer-Fraser Company

is seeking certified and qualified DBE subcontractors and/or suppliers to provide Develop Water Supply, Construction Area Signs, Traffic Control System, Channelizer, Temp Railing, Temp Crash Cushion, SWPPP, Rain Event Action Plan, Storm Water (Sampling, Analysis, Reporting), Temp Check Dam, Temp Drainage Inlet, Temp Silt Fence, Temp Construction Entrance, Clear & Grub, Roadway Excavation, Shoulder Backing, Structure Excavation, Embankment, Subgrade Enhancement Geogrid, Dry Seed, Fiber Roll, Straw, Class 2 Agg Base, Hot Mix AC, Structural Concrete, Bar Reinforcing Steel, Plastic Pipe, Corrugated Steel Pipe, Perforated Plastic Pipe Underdrain, Class 1 Permeable Material, Anchor Assembly, Cable Anchorage Assembly, Corrugated Steel Pipe Inlet, Abandon Culvert, Remove Culvert, Remove Pipe, Gabion, Rock Slope Protection, Thermoplastic Traffic Striping


PROJECT NAME:

Alderpoint Road Storm Damage Repairs

BID CONTRACT #:

217245, 217247, 217248

AWARDING AGENCY:

County of Humboldt

PROJECT LOCATION:

Alderpoint Road, Garberville, CA, 95542

BID DUE DATE:

07-18-2023 at 02:00 PM

OUTREACH COORDINATOR:

Cassie Coppini

TELEPHONE:

(707) 443-6371

FAX:

(707) 443-0277

ADDRESS:

200 Dinsmore Drive, Fortuna, CA, 95540

PROJECT DETAILS:

Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, or on the Caltrans Website. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company and Caltrans minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.

Social Media

Facebook Compliance News Twitter Compliance News LinkedIn Compliance News Rss Compliance News YouTube Compliance News

Copyright © 2026 Compliance News All rights reserved.