is seeking certified and qualified DVBE subcontractors and/or suppliers to provide Demolition, Masonry, Casework, Insulation, Roofing, Doors and Frames, Aluminum Storefront Window System, Door Hardware, Glass and Glazing, Ceramic Tile, Gyp Board, Resilient Flooring and Base, Carpet, Painting, Concrete Floor Sealer, Signage, Toilet Compartments and Accessories, Fire Ext. and Cabinets, Service Counter, Roller Shades, Telescope Bleachers, Plumbing, HVAC, Electrical, Alarm System, Fire Alarm System, Earthwork, Site Concrete, Fences and Gates, Sod Installation, Utilities.
Laguna Creek High School Modernization
Not Available
Elk Grove Unified School District
9050 Vicino Dr., Elk Grove, CA, 95758
08-17-2023 at 02:00 PM
Pam Galbreath
209-838-7388
209-838-3960
1804 Jackson Ave, Escalon, CA, 95320
PROJECT DETAILS:
DESCRIPTION: Lease Leaseback Project. Seeking Sub Bids Only.
The scope of work for this project includes but is not limited to:
THE REPLACE ALL IDF/MDF EQUIPMENT - RELOCATE IDF IN BLDG. A, B, C, D, K, L, AND M
Construction duration is expected to be 634 calendar days. Approximate start date is November 6, 2023, with all work being complete by August 1, 2025.
Engineers Estimate $ 16.9 M
Pre-bid Job walk: Tuesday, July 25, 2023 at 9:00 AM.
Location: Laguna Creek High School 9050 Vicino Dr. Elk Grove CA 95758
Plans and Specs can be reviewed on our Website at www.ctbrayton.com under “Bidding”.
Please submit all bid proposals, questions and RFI’s to estimator@ctbrayton.com or fax to 209-838-3960.
Bid proposals emailed elsewhere may not be received in time to be considered.
All Bidders must review insurance requirements and include any additional costs in their cost proposals.
Prequalification for MEP subcontractors due to District five days prior to bid date. - Any subcontractor work requiring C-4, C-7, C-10, C-16, C-20, C-34, C-36, C-38, C-42, C-43, or C-46 licenses must have current pre-qualified status with the Owner. Bidders must submit the prequalification application to the Owner by the date specified above. Bidders may obtain the prequalification application from the Owners Website.
DIR Registration requirements for all Public Works projects (SB854). The requirement to only use registered contractors and subcontractors on public works projects applies to all projects awarded on or after April 1, 2015.
a. All sub-tier subcontractors must be DIR registered contractors at all times during performance of the Work; and
b. Prospective subcontractors may only solicit sub-bids from and contract with lower-tier subcontractors who are DIR registered contractors.
AB-566 / SB-693 Skilled and Trained Workforce Requirements:
All subcontractors of any tier must comply with the requirements set forth in Education Code section 17407.5, including providing an enforceable commitment that all Subcontractors of any tier will use a “Skilled and Trained Workforce” as defined in Public Contract Code 2601(d). All Subcontractors are to carefully review all requirements set forth in Public Contract Code 2600-2603 before bidding the project.
Subcontracts will awarded by the “Best Value Subcontractor Selection” process.
All responsive bidders will be scored according to the following format.
Best Value Subcontractor Selection: The following items will be graded on a point basis as indicated. Higher scores indicate a higher level of compliance in the opinion of the scorer. One scorer will be chosen to represent the Owner, Architect, and C.T. Brayton & Sons, Inc. The Subcontractor with the highest score will be considered the ‘Best Value’ and awarded a Subcontract accordingly.
50 Points Maximum Possible Score per Scorer.
All work performed on this project which falls under the recognized jurisdiction of the Carpenter’s Master Agreement for Northern California shall be performed by Union Carpenters.
This project is Prevailing Wage. Seeking DVBE Subcontractor/Supplier Participation.