is seeking certified and qualified DBE subcontractors and/or suppliers to provide Construction Area Signs, Traffic Control, Construction Staking, Water Pollution Control Plan, Lead Compliance Plan, Fencing (Relocate Fence, Wooden Fence, Chain Link Fence), Utility Potholing, Clear & Grub, Misc. Demolition & Removal, Earthwork (Excavation/Embankment), Roadway Excavation, Adjust Utility Covers to Grade, Adjust Water Meter Covers to Grade, Adjust Monument Covers to Grade, Adjust Manhole Covers to Grade, Adjust Drainage Inlet to Grade, Convert Drainage Inlet to Junction Box, Modify Drain Inlet, Drainage Inlet, Water Quality Inlet Filter, Drainage Manhole, Plastic Pipe (HDPE), Sidewalk Underdrain, Grated Line Drain, Class 2 Aggregate Base, Concrete Grass Pavers, Minor Concrete, Gabion Basket Wall, Mechanically Stabilized Embankment, Geosynthetic Reinforcement, Detectable Warning Surface, Replace Asphalt Concrete Surfacing, Cold Plane Asphalt Concrete, Geosynthetic Pavement Interlayer, Subgrade Enhancement Geotextile, Hot Mix Asphalt, Hot Mix Asphalt Dike, Shoulder Backing, Relocate Fire Hydrant, Relocate Mailbox, Relocate Roadside Signs, Remove Thermoplastic Striping & Markings, Paint HMA Dike, Paint Curb, Thermoplastic Traffic Stripe, Parking Stripe, Thermoplastic Pavement marking, Pavement Markers, Enhanced Pedestrian Crossing Systems, Street Lighting System, Irrigation Sleeves, Wetland Mitigation
Old Arcata Road Improvements
RPSTPL-5021(023)
City of Arcata
Old Arcata Road, Arcata, CA, 95521
08-10-2023 at 11:00 AM
Cassie Coppini
(707) 443-6371
(707) 443-0277
200 Dinsmore Drive, Fortuna, CA, 95540
PROJECT DETAILS:
Mercer-Fraser Company is an Equal Opportunity Employer and is signatory with the Operating Engineers, Laborers, Carpenters and Teamsters Unions. Plans and specifications for this project are available to review upon request, please call (707) 443-6371 or e-mail info@mercerfraser.com. Mercer-Fraser Company will negotiate in Good Faith with all prospective subcontractors and suppliers for this project. Assistance may be provided to obtain bonding, lines of credit, insurance, necessary equipment, supplies and materials. Mercer-Fraser Company will break up items into economically feasible packages to encourage minority participation. Scope letters (including subcontractor conditions or exceptions) should be received 24 hours prior to bid time to allow for proper evaluation and review. 100% performance and payment bonds may be required for the full amount of subcontract price by an admitted surety and subject to approval by Mercer-Fraser Company. Mercer-Fraser Company will pay for bond premium up to 1.5%. Subcontractors must possess a current applicable Contractors license, DIR number, insurance and workers compensation coverage meeting Mercer-Fraser Company minimum requirements during the entire length on the contract, and will be required to sign the standard Mercer-Fraser Company Subcontract Agreement and provide a waiver of subrogation. A copy of the insurance requirements and subcontract agreement can be obtained by contacting our office.
PDF ATTACHMENTS: