is seeking certified and qualified MBE and WBE subcontractors and/or suppliers to provide 10 GENERAL 11 WELDING 12 TEMPORARY TRAFFIC CONTROL SECTION 01 57 23 STORM WATER POLLUTION CONTROL SECTION 01 64 00 OWNER FURNISHED PRODUCTS SECTION 10 50 50 EROSION CONTROL SECTION 26 05 00 COMMON WORK RESULTS FOR ELECTRICAL SECTION 26 05 19 LOW VOLTAGE ELECTRICAL POWER CONDUCTORS & CABLES SECTION 26 05 26 GROUNDING AND BONDING FOR ELECTRICAL SYSTEMS SECTION 26 05 33 RACEWAY AND BOXES FOR ELECTRICAL SYSTEMS SECTION 26 05 53 IDENTIFICATION FOR ELECTRICAL SYSTEM SECTION 26 32 13.13 NATURAL-GAS ENGINE DRIVER GENERATOR SET SECTION 31 10 00 SITE CLEARING SECTION 31 20 00 EARTH MOVING SECTION 31 21 00 UTILITY TRENCHING AND BACKFILL SECTION 32 11 00 PAVEMENT BASE COURSE SECTION 32 13 13 CONCRETE PAVEMENT SECTION 32 13 18 CEMENT AND CONCRETE FOR EXTERIOR IMPROVEMENTS SECTION 32 13 75 CONCRETE CURBS AND GUTTERS. SECTION 32 17 23 PAVEMENT MARKINGS SECTION 32 31 13 CHAIN-LINK FENCES AND GATES SECTION 33 10 00 WATER SYSTEM
Sonoma County Transit Electric Bus Charging Station
2024-SCT-01
Sonoma County Transit
355 West Robles Ave., Santa Rosa, CA, 95407
08-22-2023 at 02:00 PM
Leah Oba
4154568972
Not Available
5400 Hanna Ranch Road, Novato, CA, 94945
PROJECT DETAILS:
*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers’ Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.
TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder’s Exchanges, in our office at 5400 Hanna Ranch Road Novato, Monday through Friday from 7:30 AM to 4:00 PM. Plans and specifications may be emailed upon request or downloaded from the following link:
https://tpcorp.box.com/s/lzer0cirny9vj5d52ihalkr58v5y7tkp
Thompson Builders Corporation is an Equal Opportunity Employer
Contact: Leah Oba
PHONE: (415) 456-8972 FAX: (415) 459-0665
EMAIL: bids@tbcorp.com