is seeking certified and qualified DVBE subcontractors and/or suppliers to provide 02 41 19 Selective Structure Demolition; 05 50 00 Metal Fabrications; 07 84 56 Fire Safing; 07 92 00 Joint Sealants; 08 11 13 Hollow Metal Doors and Frames; 08 14 00 Wood Doors; 08 31 00 Access Doors and Panels; 08 34 83 Elevator Door Smoke Containment System; 08 71 00 Door Hardware; 09 22 16 Non-Structural Metal Framing; 09 29 00 Gypsum Board; 09 65 00 Resilient Flooring; 09 68 13 Tile Carpeting; 09 72 33 Plastic-Laminate-Clad Wall Covering; 09 91 00 Painting; 14 22 00 Traction Elevators; 14 25 00 Hydraulic Elevator Modernization; 14 31 00 New Escalators Installation; 26 00 50 Basic Materials and Methods; 26 01 00 General Conditions for Electrical Work; 26 05 19 Low-Voltage Electrical Power Conductors and Cables; 26 05 26 Grounding and Bonding for Electrical Systems; 26 05 29 Hangers and Supports for Electrical Systems; 26 05 33 Raceway and Boxes for Electrical Systems; 26 05 44 Sleeves and Sleeve Seals for Electrical Systems; 26 05 48.16 Seismic Controls for Electrical Systems; 26 05 53 Identification for Electrical Systems; 26 05 73.16 Coordination Studies; 26 05 73.19 Arc-Flash Hazard Analysis; 26 09 43 Digital Lighting Control System; 26 24 16 Panelboards; 26 27 26 Wiring Devices; 26 28 16 Enclosed Switches and Circuit Breakers; 26 51 19 LED Interior Lighting;
Elihu M. Harris Elevator Modernization
DGS007057
Department of General Services
1515 Clay Street, Oakland, CA
09-13-2023 at 02:00 PM
Leah Oba
4154568972
Not Available
5400 Hanna Ranch Road, Novato, CA, 94945
PROJECT DETAILS:
*No contractor or subcontractor may be listed on a bid proposal for a public works project (submitted on or after March 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5 [with limited exceptions from this requirement for bid purposes only under Labor Code section 1771.1(a)] *No contractor or subcontractor may be awarded a contract for public work on a public works project (awarded on or after April 1, 2015) unless registered with the Department of Industrial Relations pursuant to Labor Code section 1725.5. *This project is subject to compliance monitoring and enforcement by the Department of Industrial Relations.
We are signatory to both the Carpenters Collective Bargaining Agreement and the Laborers Collective Bargaining Agreement. Certification of insurance for General Liability and Workers’ Compensation are required. A Waiver of Subrogation will also be required with all Subcontract Agreements. Subcontractors’ faithful performance and payment bonds in the amount of the subcontract price will be required. Reasonable market rate bond premium will be reimbursed by Thompson Builders Corporation.
TBC is willing to discuss breaking down bid items into economically feasible units for minority participation. Our estimating department is available for assistance with bonding, lines of credit, insurance, equipment, supplies and/or materials. The Small Business Administration (www.sba.gov ), the California Dept. of General Services (www.dgs.ca.gov) and U.S. Dept. of Transportation Office of Small and Disadvantaged Business Utilization (www.osdbu.dot.gov ) may also be able to offer financial assistance and/or information regarding insurance and bonding. Plans and specifications may be viewed at various local Builder’s Exchanges, in our office at 5400 Hanna Ranch Road Novato, Monday through Friday from 7:30 AM to 4:00 PM. Plans and specifications may be emailed upon request or downloaded from the following link:
https://tpcorp.box.com/s/qzeybgc9ac2t7f4vfol2qexwbruy6mjk
Thompson Builders Corporation is an Equal Opportunity Employer
Contact: Leah Oba
PHONE: (415) 456-8972 FAX: (415) 459-0665
EMAIL: bids@tbcorp.com