is seeking certified and qualified DVBE subcontractors and/or suppliers to provide LEAD COMPLIANCE PLAN, CONSTRUCTION AREA SIGNS, TRAFFIC CONTROL SYSTEM, STATIONARY IMPACT ATTENUATOR, STRIPING AND PAVEMENT MARKINGS, RADAR SPEED FEEDBACK SIGNS, PORTABLE CHANGEABLE MESSAGE SIGNS, PREPARE STORM WATER POLLUTION PREVENTION PLAN, INSTALL/REMOVE TEMPORARY BMP’S, FURNISH BMP’S, STREET SWEEPING, TREATED WOOD WASTE, CLEARING AND GRUBBING, TRUCKING, DIRT EXPORT, LANDSCAPE & IRRIGATION, FURNISH PVC PIPE, FURNISH AGGREGATES, FURNISH READY-MIX CONCRETE, FURNISH HOT MIX ASPHALT, PLACE HMA DIKE, COLD PLANE AC, JOINTED PLAIN CONCRETE PAVEMENT, CAST-IN-DRILLED-HOLE CONCRETE PILE, PRESTRESSING CAST-IN-PLACE CONCRETE, BRIDGE DRAINAGE MATERIALS, JOINT SEAL, BAR REINFORCING STEEL, FURNISH AND INSTALL SIGN STRUCTURE, BRIDGE REMOVAL, FURNISH RCP, FURNISH CSP, WET UTITLIES, SLOPE PAVING, ROCK SLOPE PROTECTION, MISCELLANEOUS IRON AND STELL, FENCING, ROADSIDE SIGNS, MIDWEST GUARDRAIL SYTEM AND RELTATED, VEGETATION CONTROL, CONCRETE BARRIER, RUMBLE STRIP, ELECTRICAL AND LIGHTING, SUBSURFACE LOCATOR, QUALITY CONTROL & TESTING
11-2T3644 - Construct JPCP, HMA, RHMA-G, signs, barriers, landscape, & electrical
11-2T3644
Caltrans
RT 56 from El Camino Real to Carmel Valley Rd, San Diego, CA, 92130
08-31-2023 at 02:00 PM
Amanda Redmond
858-587-3600
858-453-6034
10529 Vine Street, Lakeside, CA, 92040
PROJECT DETAILS:
Hazard Construction Engr LLC is seeking qualified and certified DVBE subcontractors, and material and/or equipment suppliers in the areas of work included in, but not limited to, those listed below. A complete set of plans, specifications and any addendums that may be issued for this project are available for your review at no charge in our plan room or download at the agency’s website:
https://ppmoe.dot.ca.gov/des/oe/weekly-ads/all-adv-projects.php
*** THIS IS A PREVAILING WAGE PROJECT ***
IMPORTANT! We are an Equal Opportunity Employer. We seek and encourage bids from certified SLBE, ELBE, DBE, UDBE, DVBE, SBE, MBE, WBE and OBE businesses. If your scope of work requires materials, please consider and list suppliers on your quote. For all public projects Payment and Performance Bonds are required for 100% of the subcontract amount. Hazard will compensate for up to 3% for the required Bonds.
Please contact Hazard Construction Company should you need assistance in obtaining bonding, lines of credit or required insurance, equipment, supplies and or materials. Please visit our website to view Hazard Construction Company’s Insurance Requirements for General Liability, Auto and Workers’ Compensation for Subcontractors at http://www.hazardconstruction.com/HCCInsReq.pdf.
Please note that the requirements of SB 854 became effective on March 1, 2015. From this point forward All contractors and subcontractors who bid or work on a public works project must register and pay an annual fee to DIR. No Subcontractor may be listed on a public works projects without this registration # and expiration date. The following link leads you to a search website where you can enter the contractor’s legal name or license number https://efiling.dir.ca.gov/PWCR/Search.action