is seeking certified and qualified DBE subcontractors and/or suppliers to provide Water Pollution Control, SWPPP, Traffic Control, Traffic Control Plan, Construction Area Signs, Portable Message Signs, Flagging, Sweeping, Storm Drain Catch Basin, Storm Drain Manhole Materials, HDPE Pipe, Valve Boxes, Fire Hydrants, Saw Cutting, Cold Plane Pavement, Aggregate Base, AC Paving, Hot Mix Asphalt, Asphalt Oil, Tack Coat, Slurry Seal/Microsurfacing, Adjust Castings, Concrete, Removal of Thermoplastic Striping, Thermoplastic Striping, Signage, Reflective Pavement Markers, Traffic Detector Loops
LOUISE AVE AND MCKINLEY AVE INTERSECTION IMPROVEMENTS
CIP PS 15-02
City of Lathrop Department of Public Works
LOUISE AVE AND MCKINLEY AVE INTERSECTION, Lathrop, CA, 95330
08-30-2023 at 04:00 PM
Ashley Cruz
209-932-2100
209-948-6652
655 W. Clay Street, Stockton, CA, 95206
PROJECT DETAILS:
Please contact Knife River Construction for assistance in obtaining bonds, insurance, lines of credit, equipment, supplies, materials or project plans and specifications.
Knife River Construction is willing to break out any portion of work to encourage DBE participation.
We are an Equal Opportunity Employer.
Please submit any quotes to Knife River for review by 8/28/2023