is seeking certified and qualified DBE subcontractors and/or suppliers to provide ADJUST MANHOLES/VALVES, AGGREGATE BASE, BAR REINFORCED STEEL, BLOCK WALL/RETAINING WALL, CATCH BASINS, CHAIN LINK FENCE, CLEARING AND GRUBBING, COLD MILLING, CONC. STRUCTURES & REBAR (CB’S), CONCRETE, CONCRETE BARRIER, CONSTRUCTION AREA SIGNS, DOWELS & BASKETS, DEWATERING, ELECTRICAL, EROSION CONTROL (TYPE D), EXCAVATION, FENCING, GEOTEXTILE FABRIC, GRINDING, GUARD RAIL, HAZARDOUS SOIL DISPOSAL, IMPORT MATERIALS, JOINT SEAL, LANDSCAPE/IRRIGATION, LOOPS, TIMBER LAGGING AND SHOTCRETE, NOISE MONITOR/BIOLOGIST, PILING-CIDH AND DRIVEN, PULVERIZATION, RCP, RETAINING WALL, RAIL ROAD, SIGNS, SIGN STRUCTURES, SAWCUT, SHORING, SOIL SERILANT, REINFORCED CONCRETE PIPE, STAMPED/PATTERNED CONCRETE, STORM DRAIN, STREET LIGHTS, STRIPE/MARK, STRUCTURES, SURVEY/SURVEY MONUMENTS, SWPPP, STRUCTURAL STEEL, TRAFFIC CONTROL, TREE REMOVAL, UNCLASSIFIED EXCAVATION, WATER PROOFING, MATERIALS, RENTAL EQUIPMENTS, TRUCKING.
State Route 47/Vincent Thomas Bridge & Front Street/Harbor Boulevard Interchange Reconfiguration
Specification No. 2816
Port of Los Angeles
SR 47 and Vincent Thomas Bridge, San Pedro, CA, 90732
09-28-2023 at 02:45 PM
Jessica Daniels
17145789600
714-578-9672
135 S STATE COLLEGE BLVD STE 400, Brea, CA, 92821
PROJECT DETAILS:
An Equal Opportunity Employer
License No. 747612-A
DIR Registration No. 1000003664
135 S. State College Blvd., Suite 400, Brea, CA 92821
Phone: (714) 578-9600 FAX: (714) 578-9672
Contact: Estimating Department
Plans, Specifications and Project Requirements are available for viewing on the Sully-Miller Website: www.sully-millerplans.com, or can be downloaded at “No Cost” from the Bid Board’s website: https://www.ebidboard.com/login.asp. The Plans and Specifications can also be obtained from the City of South Gate, Department of Public Works, 8650 California Avenue, South Gate, CA 90280 for a non-refundable fee of $75.00 or if requested by mail for a non-refundable fee of $ 100.00.
Sully-Miller is willing to set aside any portion of work, no matter how small to encourage (DBE PARTICIPATION 23%) participation. If you require information regarding assistance in obtaining bonding, insurance, credit, equipment, supplies, materials, or related services, please call our office.
100% Payment and Performance Bonds May Be Required
PDF ATTACHMENTS: